2018-01-15 GC Agenda - Attachment 1 to Item 6 - P&E Court Appeal 344 of 2009
Electricity and Telecommunication Services
30. A connection to reticulated electricity and telecommunication services must be
provided to each lot in accordance with an approval for Operational Works and the
standards and requirements of the relevant service provider.
31. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
32. Certification must be submitted from all relevant service providers which certify that
the development has met the requirements of this Decision Notice and all applicable
legislation at the time of construction.
Easements
33. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property. All easements must be designed in
accordance with the planning scheme and granted at no cost to the Grantee. Where
the Grantee is Council or a service authority, the easement documentation must be in
accordance with the Grantee’s standard easement terms.
34. Draft easement documentation must be submitted to Council for endorsement.
35. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
36. All fill and associated batters must be must be undertaken in accordance with an
Operational Works approval and contained entirely within the subject site, unless
written permission from the respective landowner(s) is provided to Council.
Damage to Services and Assets
37. Any damage caused to existing services and assets above or below the ground must
be repaired:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
ENVIRONMENT
Reserves
38. The land areas identified as “Park” on the approved plans (as amended) must be
dedicated to the Crown as Reserve(s) for Environmental Purposes. The land to be
dedicated is “non-trunk infrastructure” for the purposes of the Integrated Planning Act
1997.
39. The land areas to be transferred must be unencumbered by services such as pump
stations, services, easements or similar operational uses.
40. Those areas within the land areas identified as “Park” on the approved plans (as
amended) which are required for stormwater infrastructure must be dedicated to the
Crown as Reserve(s) for Drainage.
41. The Energex power line easements EMT “B“ RP177295 and EMT “C” RP177294
within the land areas identified as “Park” on the approved plans (as amended) and
exclusive of areas required for Reserves for Drainage must be dedicated to the
Crown as Reserve(s) for Open Space.
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.