Response to Information Request
Issue – Stormwater
The submitted material does not include an indication of how stormwater runoff from the
proposed development will be collected and controlled for each of the proposed lots.
Council has concerns with the potential for stormwater drainage impact (increased runoff
or additional ponding) onto the adjoining properties and how the site’s stormwater will be
managed.
Information Required
2. Provide a stormwater management plan for each of the proposed lots – prepared by
a RPEQ (Registered Professional Engineer of Queensland) – including but not limited
to:
(a) demonstrating that there will be no offsite impacts and that the runoff from
the site is suitably controlled to ensure that the downstream environment is
not adversely affected or destabilized;
(b) details of collection and discharge of stormwater runoff from the buildings and
the hardstand areas;
(c) details of how the proposed Lot 20 will not increase stormwater runoff
(volume and velocity) into proposed Lot 21, specifically with the increase in
hardstand area (i.e. new driveway);
(d) any required stormwater easement in proposed Lot 21 for the benefit of
proposed Lot 20;
(e) the structures for the operational phase of the development, including size of
the pipes required, levels, grades, discharge points, etc.;
(f) be consistent with any site specific geotechnical report recommendations;
3. Provide RPEQ certification that the proposed Stormwater Design for the subject
development is in accordance with The Noosa Plan and QUDM.
Comment:
Please see Stormwater Management Plan undertaken by Callaghan and Toth and included
as Appendix A of this response demonstrating compliance stormwater management
arrangements for the proposed development.
Issue – Access
The submitted plans do not include sufficient detail on the driveway and access to
proposed Lot 21.
Information Required
4. Provide additional detail on the driveway and access to proposed Lot 21. The detail
must be prepared by a suitably qualified person and include but not be limited to:
(a) levels and grades of the access driveway;
See the original