Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Response to Information Request

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Issue – Stormwater

The submitted material does not include an indication of how stormwater runoff from the
proposed development will be collected and controlled for each of the proposed lots.
Council has concerns with the potential for stormwater drainage impact (increased runoff
or additional ponding) onto the adjoining properties and how the site’s stormwater will be
managed.


Information Required
2.    Provide a stormwater management plan for each of the proposed lots – prepared by
      a RPEQ (Registered Professional Engineer of Queensland) – including but not limited
      to:
      (a)   demonstrating that there will be no offsite impacts and that the runoff from
            the site is suitably controlled to ensure that the downstream environment is
            not adversely affected or destabilized;
      (b)   details of collection and discharge of stormwater runoff from the buildings and
            the hardstand areas;
      (c)   details of how the proposed Lot 20 will not increase stormwater runoff
            (volume and velocity) into proposed Lot 21, specifically with the increase in
            hardstand area (i.e. new driveway);
      (d)   any required stormwater easement in proposed Lot 21 for the benefit of
            proposed Lot 20;
      (e)   the structures for the operational phase of the development, including size of
            the pipes required, levels, grades, discharge points, etc.;
      (f)   be consistent with any site specific geotechnical report recommendations;
3.    Provide RPEQ certification that the proposed Stormwater Design for the subject
      development is in accordance with The Noosa Plan and QUDM.



Comment:

Please see Stormwater Management Plan undertaken by Callaghan and Toth and included
as Appendix A of this response demonstrating compliance stormwater management
arrangements for the proposed development.


Issue – Access

The submitted plans do not include sufficient detail on the driveway and access to
proposed Lot 21.

Information Required
4.    Provide additional detail on the driveway and access to proposed Lot 21. The detail
      must be prepared by a suitably qualified person and include but not be limited to:
      (a)   levels and grades of the access driveway;
Log in to download the original file

Response to Information Request.pdf · 205 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.