Original source · versioned page text
2015-11-10 Infrastructure & Services Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 10 NOVEMBER 2015
Page 13 of 88
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 10 NOVEMBER 2015
Attachment | Final Evatuaton Worksheet
Final Evaluation
Weighted Attribute Evaluation Spreadsheet
ene —__ [as
No.|NAME OF TENDERER Rates Submitted [+—_+—__}+_+_+__+_#_ +_ _
1 [DownerEDIWorks(A) CdS eo — # “ * ¢ . 2 8 ce
3 |Reniworth River Sand Ph Ua ey |. #7 The ratings
4 [Tropic Asphalts Pty Ltd(0)__————SSCSCSCSCS SCS SF +0 (zero) = Unacceptable ~ a fal for that cnteria and extreme risk
© | grrr Se * 20 (twenty) = Very Poor ~ the content of the submission for that criteria is of 2 low standard and high risk
0 eee eee * 40 (forty) = Poor — the content of the submission for that criteria is unimpressive and poses a moderate risk
ee + 60 (sixty) = Good — the content of the submission for that criteria 's mertable and wil need to be monitored i awarded
Be * 80 (eighty) = Very Good — the content of the submission for that criteria is of a high standard and advantageous
9p * 100 (one-hundred) = Exceptonal - the content of the submission for that critera is fiawiess / outstanding and most advantageous
by Te Once aill the data 1s entered the resutant scores based on the pnce and non pnce elements are automatically calculated for you
OT
912 ee
6
16
NON-CONFORMING TENDERS Number of Tenders Evaluated = [4 ]
Po Bo not evaluate |
1 2 3 4
pescnrnon | wocwrmos | sa] See [oust] Set [oo] SS | oer] SE
wegring weighing wegnhtng
— — km UE 6hUuES 6
ee en
sey: ee: ee; ee:
contibutiontoLocateconomy | se | 48 | 2+ | se | 20 | a | 2: [ORR] 2 |
Total Technical Score 100% Pg 709
Normalised Technical Score (Tn) [too
PART B - Price element aa | Planttive(@) | sandPyuidic) | prewia iD) —_|
Total Fees (Pc) 1 $1 , 7 1
: a |
Price Score 100 100 100 100
Normalised Price Score (Pn) 100 100 100 100
|Weighted Price Score (Pw)
elements
OTHER DETAILS
Assesment panel member 1 Allan Hull
Assesment panel member 2 Cameron Shields
Assesment panel member 3 Jono Mcintyre
Assesment panel member 4 David Shing
Assesment panel member 4 Brian Freeman The Contract Administrator confirms the above weightings
QBSA LICENCE CHECKED (if applicable) Contract Administrator's signature:
Copy of Evaluation Workbook - Allan Hull_V2 Page 1 28/10/2015
Page 13 of 88See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.