Skip to the record
Accept no substitutions.

Original source · versioned page text

2015-11-10 Infrastructure & Services Committee Agenda

of 88

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING REPORT   10 NOVEMBER 2015




                                                          Page 28 of 88

100737 - Gibson Road (Eumindi Noosa Rd to Thomas St) - On road cycle                      0               15,000              13,767                    oo             91.78% @ @QO@
500043 - Noosa Heads - Park Road boardwalk design                                         0              156,865              4,967                    08               31% @@9O@
500099 - Eenie Creek Pathway Stage 1 Signage                                              0               19,003               2,893                   098             15.22% 900090
500103 - Cooroy Noosa Road Corridor Improvement                                           0              88,554               31,080               11,016 @            3510%9 9 O@
500526 - Noosa Heads Park Road, Boardwalk Design and consultation                   200,000              200,000             22,949                26,158 @            114% @@9O9
500527 - Noosa Heads Sheraton Boardwalk rehabilitation                               63,000               63,000              25,242                   08             40.07%      @9@OO@
                                      Total Pathways & Enabling Facilities          263,000             542,422              106,038               37,174              19.55%
500080 - Standards Review - Standard Drawings                                             0               13,791               1,744                    oo             126% 9 @@Q9O          a
500081 - Whole of Shire Traffic Study                                                     0               41,201                   0               13,200 @             00% @O@@
500106 - Noosa River Flood Mitigation Strategy                                            0               39,184               5,684               26,384 @            1451%9 O8O@Q
500107 - Noosa River Hydraulic Model                                                      0             290,052                6,407               90,875 @             22%90 09090
500543 - Whole of Shire Planning Scheme Development Projects 2016                   400,000             400,000                1,479                   09g              03%O9 OQOQ
                                                  Total Planning Scheme            400,000               784,228              19,392              135,459               2.47%

500001 - Electric Bus Feasibility Study                                                   0               4,366                    0                    08              0.00%         (x)
500050 - Noosa Junction Transit Centre - improve                                          0               40,000                   0                   09               00%8 O9@O@
500083 - Noosa Bus Station Safer Streets Program                                          0              50,291               13,103               18,338 @            2600%O8 O9OO@
500209 - Electric Bus Charging Station and Installation                                   0               77,910              71,958               21,689 O            923% @ O09 GO @
500528 - Whole of Shire Bus Shelter Disabled Compliant Program: 2016               1,500,000           1,500,000              71,177                   oo               473% @@9080
                                     Total Public Transport Infrastructure         1,500,000           1,672,567            225,231               40,027               13.47%

100742 - Sealed Road Pavement surveys and Investigations                                  0               39,064                989                15,000 @             25%@0 0900
500054 - Whole of Shire - pavement surveys                                                0               19,687              12,796                5,[email protected]% @ @QO@
500055 - Whole of Shire - reseal and rehab                                                0            1,378,679              93,633              239,627 @             67%OOBO98
500118 - Dr Pages - Kinmond Creek Rd Initial Planning & Design                            0              75,055              94,022                     08            125.2%      @9@O@O8@Q
500206 - Tewantin Cooroy Noosa Rd Stages 2-6 Design Only                                  0              120,986               6,555                   09               542%90        099090
500530 - Whole of Shire Reseal & Rehabilitation Program 2015/2016                  4,750,000           4,750,000                 528                 909 @              001%O BOB
500531 - Whole of Shire Pavement surveys and Investigations 2015/2016                60,000              60,000                 506                 7,905 @             034% @OOQWO
500544 - Cootharaba - Dr Pages Road & Kinmond Creek Rd - Construction             4,700,000            4,700,000             138,110            4,791,824 @             294%#@ @QGO@
                                             Total Sealed Roads Network            9,510,000          11,143,471             354,915            5,060,936               3.18%

500108 - Girraween Sports Complex Lighting                                                0               10,000                   0                4,527 @             00% 9 OO @
500545 - Tewantin Noosa District Sports Complex - Internal roadway pl               30,000               30,000                    0                   09               00% @OO Oy
                                       Total Sports Ground and Facilities           30,000               40,000                    0                4,527               0.00%

100745 - Gympie Terrace Pipe Rehabilitation - Investigation & Design                      0               10,763              3,370                 5,640 @            3131%% @ @ @ @
500057 - Gympie Terrace pipe rehabilitation                                               0              194,386                662                 3,500 @             034%8 8898
500058 - Re-lining of Ben Lexcen stormwater                                               0               28,257             137,042                   08            484.9% @ @ BO

                                                                                                                              Page 28 of 88
Log in to download the original file

2015-11-10 Infrastructure & Services Committee Agenda(PDF, 6MB).pdf · 6.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.