INFRASTRUCTURE & SERVICES COMMITTEE MEETING REPORT 10 NOVEMBER 2015
Page 29 of 88
Es
%ofAnnual - 9 J 2
Original Current Year To Date Remaining Budget Spent = a 2 x o
Project Budget Budget Actual Commitments (Acuals) 2 6 6 © &
500060 - Whole of Shire - stormwater structures 0 47,581 12,545 0g 2637% @ @@@Q
500084 - Whole of Shire - Flood mitigation stage 0 2,097,747 1,092,067 160,045 @ 520%@ @O@
500532 - Whole of Shire CCTV Drainage program 2015/2016 50,000 50,000 0 0o 00%@ OOO
500533 - Whole of Shire Pipe re-lining/ rehabilitation program 2016 250,000 250,000 303 09 01%9 0090
500534 - Whole of Shire Stormwater Pit Structure renewal program 2016 200,000 200,000 0 oo 00%9 O@O@Q
500535 - Whole of Shire Kerb & Channel Renewal Program 2015/2016 50,000 50,000 0 oo 00%O9@ OO@Q
Total Stormwater Drainage 550,000 2,928,733 1,246,146 169,185 42.55%
Streetscapes and Road Corridors
500085 - Peregian Beach - precinct planning 0 29,618 468 0o 158% @ @ @ @
Total Streetscapes and Road Corridors 0 29,618 468 0 1.58%
Transport and Infrastructure Management
100752 - Weyba Road Reef Street Intersection Improvements - PIP 0 104,480 13,940 19,030 @ 133% @ @O@
500064 - Sunrise Beach - Ben Lexcen Dr school 0 45,716 61 0g 013%9 @O@Q
500536 - Tewantin Cooroy Noosa Rd Traffic Management Construction - A 160,000 160,000 427 09 027% 0209090
500546 - Whole of Shire Forward Planning & Design Program - Construct 300,000 300,000 3,356 6,160 @ 112% @@0908@0
500547 - Sunrise Beach Ben Lexcen Drive School Crossing Improvement-c 430,000 430,000 6,189 35,350 @ 14470 00890
500548 - Road directional signage (incl Noosa Entrance sign 50,000 50,000 0 0g 00% @ DOWD
500552 - Noosa Transport Strategy 150,000 150,000 8,251 3,500 @ 55%9 @O9Q
500553 - Whole of Shire Street lighting program 2015/2016 15,000 15,000 0 08 00% 8 O00 OR
Total Transport and Infrastructure Management 1,105,000 1,255,195 70,291 64,040 5.60%
Waste Management
500112 - Noosaville Landfill - Dosing & Monitoring Equipment 0 120,000 0 08 00% 9 O@O@Q
500537 - Noosaville Eumundi Rd Landfill Concrete Approaches to Weighb 200,000 200,000 141,027 10,[email protected]%O O@O@Q
500549 - Noosaville Eumundi Rd Landfill Prepare Cell 2.2 80,000 80,000 1,516 09 199%%9@ @ @ @
500550 - Noosaville Eumundi Rd Landfill Relocate Concrete Processing 30,000 30,000 0 09 00%8 O@O@
Total Waste Management 310,000 430,000 149,973 11,693 34.88%
Grand Total 19,370,105 27,429,313 3,605,740 8,581,567 13.15%
Emergent Works Funding
500529 - Whole of Shire Other Emergent Works Program 2015-2016 3,933,895 3,933,895 [email protected]%
Page 29 of 88See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.