Original source · versioned page text
2015-11-10 Infrastructure & Services Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
INFRASTRUCTURE & SERVICES COMMITTEE MEETING REPORT 10 NOVEMBER 2015
Waste & Environmental Health
13 TENDER DEVELOPMENT FOR NEW WASTE MANAGEMENT CONTRACT
COMMENCING 2017
DOCUMENT INFORM AT ION
Author Manager Waste and Environmental Health, Wayne Schafer
Community Services Department
Index ECM/Subject/Waste Management/Contract – Resource Recovery
Attachments 1. Essential Decisions Required for Drafting the Waste Contract
Tender
EXECUTIVE SUMMARY
This report seeks to confirm by Council resolution the discussions held at the Councillors’ Waste
Workshop held on 28 September 2015.
RECOMMENDATION
That Council note the report by the Manager Waste and Environmental Health Branch to the
Infrastructure & Services Committee Meeting dated 10 November 2015 and:
A. Agree to extend Separable Portions A, B and C of the existing waste Management
Contract held by Cleanaway for a further period of one year to expire on 30 August 2017;
B. Resolve that the next Waste Management Contract be called for a period of 7 years with
options for Council to extend the contract for a further 3 x 1 year extensions at Council’s
discretion;
C. Agree to the preparation of the tender for the next Waste Management Contract to include
the servicing criteria and areas to be serviced as detailed in Attachment 1 to the Report,
with further consideration to be given to extending the Garden Waste service to Rural
Residential areas; and
D. Note that staff will commence drafting a Waste Reduction and Recycling Plan as required
under the Waste Reduction and Recycling Act 2011 to incorporate the existing and
proposed future waste management initiatives for managing waste, recycling and waste
reduction.
REPORT
1. Background
The Waste Management Contract is the largest contract let by Council. It is a very significant
contract given its high public profile involving the provision of waste collection services to the
front property alignment to nearly every occupied property within the shire, on a weekly or more
frequent basis.
The contract involves significant risks in the management of the Eumundi Road landfill and
Resource Recovery Facility in accordance with best practice environmental standards. It also
seeks to maximize the recovery of reusable material and minimizing the quantity of waste sent to
landfill.
Page 76 of 88
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.