Original source · versioned page text
H - Revised Integrated Water Management Plan by Cardno (inc MUSIC file) (13.09.19)
Plans and drawings: the text below has words only, no drawings.
Integrated Water Management Plan
Noosa Marketplace : 2-20 HOFMANN DRIVE
Table of Contents
1 Introduction 3
2 Request for Information 4
2.1 Background 4
2.2 Information Required 4
3 Site Description and Proposed Development 8
3.1 Site Description 8
3.2 Land Encumbrances 8
3.3 Proposed Development 8
3.4 Lawful Points of Discharge 8
4 Hydrology 10
4.1 Background 10
4.2 Model Setup 10
5 Stormwater Quantity Management 13
5.1 Background 13
5.2 Model Setup 13
5.3 Model Results 15
6 Stormwater Quality Management 16
6.1 Stormwater Quality Objectives 16
6.2 Proposed Stormwater Quality Treatment 17
6.3 MUSIC Model Results 22
6.4 Construction Phase Water Quality Management 22
6.5 Maintenance 22
7 Hydraulic Analysis 23
7.1 Introduction 23
7.2 Model Setup 23
7.3 Modelled Events 24
7.4 Results 24
7.5 Severe Storm Impact Assessment 34
8 Conclusions 36
Appendices
Appendix A – Development Layout
Appendix B – TUFLOW Layout
Appendix C - Flooding Results
Appendix D – Treatment Devices
V190428 | 10 September 2019 | Commercial in Confidence 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.