Original source · versioned page text
H - Revised Integrated Water Management Plan by Cardno (inc MUSIC file) (13.09.19)
Plans and drawings: the text below has words only, no drawings.
Integrated Water Management Plan
Noosa Marketplace : 2-20 HOFMANN DRIVE
Tables
RAFTS Catchments ............................................................................................................... 11
Table 4-2 Initial and Continuing Losses for RAFTS Modelling .............................................................. 11
Rational Method Verification .................................................................................................. 12
1% AEP Peak Flows (m 3/s).................................................................................................... 12
Local Catchment Parameters ................................................................................................ 13
Table 5-2 Proposed Stormwater Detention Tank Parameters ............................................................... 14
Table 5-3 Peak XP-RAFTS Discharge ................................................................................................... 15
Table 5-4 Tank Storage Volume ............................................................................................................ 15
Table 6-1 Rainwater Tanks MUSIC Details ........................................................................................... 18
Rainfall Runoff Parameters for Commercial Source Nodes .................................................. 18
Pollutant Export Parameters for Commercial Source Nodes ................................................ 18
Catchment Areas and Proposed Stormwater Treatment ....................................................... 20
Table 6-5 Bio-Basin 1 Details ................................................................................................................. 20
Table 6-6 Pollutant Capture Rates ......................................................................................................... 20
MUSIC Model Results ............................................................................................................ 22
Mannings ‘n’ Values ............................................................................................................... 23
Table 7-2 Existing Flood Level (mAHD) ................................................................................................. 26
Table 7-3 Developed Flood Level (mAHD) ............................................................................................ 28
Table 7-4 Flooding Impacts (m) ............................................................................................................. 33
Figures
Figure 1-1 Subject Site 3
Figure 3-1 Modelled Existing Site Drainage 9
Figure 4-1 RAFTS Catchments 10
Figure 6-2 MUSIC Model Layout 19
Figure 6-3 MUSIC Model Catchments 21
Figure 7-1 Locations of Interest 24
Figure 7-2 Existing Ponding 25
Figure 7-3 Drainage Upgrades 27
Figure 7-4 Overland flowpath (approximate location) 28
Figure 7-5 P4 Water Surface Profile 29
Figure 7-6 Flow Capture Line L16 30
Figure 7-7 Culvert C1 & C26 31
Figure 7-8 P10 Water Surface Profile 32
Figure 7-9 P10 Profile Location 32
Figure 7-10 Point 5 Water Surface Elevation 34
Figure 7-11 ZAEM1 Flood Hazard Curves 34
Figure 7-12 Developed Hazard Class - PMF 35
V190428 | 10 September 2019 | Commercial in Confidence 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.