Skip to the record
For the highest quality transcripts.

Original source · versioned page text

H - Revised Integrated Water Management Plan by Cardno (inc MUSIC file) (13.09.19)

of 95

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                 Ocean Protect | OceanGuard Installation Guide

Installation Procedure
The aim of all pit insert installations is to install the largest unit into each pit, without influencing the hydraulic
performance of the pit or drainage system.

Strut Install
    1. Measure the internal dimensions of the pit while marking the center of the pit length, at 150mm
       down from entry of pit (the height where the struts are to be secured).




    2. Mark the position of the holes for the L-brackets, based on the center mark


    3. Using an 8mm masonry drill bit drill holes for the insertion of the Dyna Bolts
       (4 holes total, 2 per strut)




    4. Attached L-brackets with dyna bolts to the pit wall (4 locations)




                                                                                                          Page 3 of 5
Log in to download the original file

H - Revised Integrated Water Management Plan by Cardno (inc MUSIC file) (13.09.19).pdf · 9.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.