Skip to the record
Accept no substitutions.

Original source · versioned page text

H - Revised Integrated Water Management Plan by Cardno (inc MUSIC file) (13.09.19)

of 95

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                            Ocean Protect | OceanGuard Installation Guide


   5. Align T-strut onto L-brackets and secure with pop rivets, repeat for second strut




Flow Diverter Install
   1. Measure the internal dimensions of the pit at the height at which the plastic is to sit. If necessary
      trim flow diverter panels to fit internal dimensions (add an additional 20mm each side to ensure
      tight pressure fit)




   2. With the plastic bent slightly upwards, lower the Top Section into the pit, guiding the unit so that it
      locates on the T Sections struts.




   3. Drill a 5mm hole through the flow diverter and into the strut for each T-strut, and secure the flow
      diverter to the T-strut with a pop rivet. NOTE: if you OceanGuard requires a Filtration Cage this
      step can be skipped and addressed as part of the Filtration Cage Installation.


                                                                                                  Page 4 of 5
Log in to download the original file

H - Revised Integrated Water Management Plan by Cardno (inc MUSIC file) (13.09.19).pdf · 9.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.