Original source · versioned page text
2019-03-18 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 18 MARCH 2019
27. Prior to the commencement of use of Stage 1 of the development, the applicant
must construct an eastern extension of Grasstree Court, incorporating kerb and
channel on both sides, to provide a direct connection to Ben Lexcen Drive. The
intersection must be a full intersection generally in accordance with the plan titled
Conceptual Intersection Details Ben Lexcen Drive and Grasstree Court Option 2
(Project No, 18-001942 Drawing Number 3000-SK-005) prepared by Calibre and
dated 15.01.19. The centre of the intersection of the Grasstree Court extension
with Ben Lexcen Drive must be located in line with the common property
boundary between 38 Ben Lexcen Drive and 40 Ben Lexcen Drive. The Ben
Lexcen Drive service road carriageway must be realigned as necessary to
intersect at a right angle with the Grasstree Court extension. The roadworks and
intersection must be of sufficient size to cater for large vehicles, including
Council’s articulated library vehicle, to access Grasstree Court, the frontage of
the local shops and the Lipton Street roundabout.
All associated and ancillary work including pavement correction to the existing
pavement, drainage works, modification of the footpath, and adjustments to the
existing infrastructure shall be undertaken to complete the roadworks.
In this regard a schedule of works, specifications and plans detailing this work
shall be prepared and submitted to Council for approval prior to obtaining a
Development Permit for Operational Works.
30.1 Remove the existing roadway and footpath connection between Ben
Lexcen Drive and the adjacent service road through the north-east corner
of Lot 9 SP 252905 and across the Ben Lexcen Drive verge. Kerb must be
re-instated on the western side of Ben Lexcen Drive where the roadway
connection currently joins and a concrete footpath, at least 2 metres wide,
must be constructed along the western verge of Ben Lexcen Drive from this
point up to the intersection with the Grasstree Court extension,
33. Pedestrian crossings shall be provided in Grasstree Court generally as shown on
‘Masterplan’ prepared by Smith and Tracey dated November 2018, Plan Ref:
DA_106. The crossing shall include linemarking and suitable signage in
accordance with the MUTCD.
35. Vehicular access driveways to service the development shall be constructed from
the Grasstree Court frontages of the site. The driveways shall be generally in
accordance with Council’s standard drawing SEQ R-051 and Masterplan’
prepared by Smith and Tracey dated November 2018, Plan Ref: DA_106.
39. The vehicle access driveway to proposed carparking level in the apartment
buildings must be constructed prior to the commencement of the use of the
apartment buildings.
40.1 Generally in accordance with drawing number ‘Masterplan’ prepared by
Smith and Tracy dated November 2018, Plan Ref: DA_106,
41. Carparking shall be provided within the sites generally as shown on drawings
numbered DA_114 “Masterplan/Carpark Layout” prepared by Smith and Tracey
Architects dated November 2018 and DA_133 “Apartment Buildings – Basement”
prepared by Smith and Tracey Architects dated November 2018 and within the
“Independent Living Units” as shown the approved floor plans, except as
modified herein.
Page 6 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.