GENERAL COMMITTEE MEETING 18 MARCH 2019
57. A preliminary Construction Management Plan must be submitted with the
Operational Works application and must address the following:
a. traffic management during all aspects of the construction phase
including:
i. a Traffic Management Control Plan in accordance with the
Manual of Uniform Traffic Control Devices (MUTCD) detailing
all temporary signage and traffic control measures prior to
construction
ii. maintenance of safe pedestrian access, including safe
passage for children attending nearby schools, for the areas
affected by the works during and after daily construction has
ceased
iii. proposed fencing to the site during the construction phase of
the development
iv. approval of the Traffic Management Control Plan by the
Department of Transport and Main Roads (DTMR) for any
works on State controlled roads
v. provision for worker car parking
b. maintenance and protection of water quality and existing drainage
lines through the construction site, through the implementation of
appropriate erosion and sediment control measures
c. works programme identifying key components of the works and their
respective durations
d. establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to
advise of agreed construction times, impacts on traffic, services and
other relevant issues
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. It is acknowledged that the preliminary Construction Management
Plan will be a draft document requiring finalisation upon appointment
of the Principal Contractor employed to construct the works and a
final document will be required to be submitted at the Pre-Start
Meeting for the project.
64. The works must be undertaken in accordance with an Operational Works
approval and the latest version of the Water Sensitive Urban Design Technical
Design Guidelines for South East Queensland, and must include in particular:
64.1 Stormwater quality treatment devices of a size and location generally in
accordance with those documented in the revised site SWMP required by
the above condition; and
64.2 Bioretention devices which:
64.2.1 Are designed generally in accordance with IPWEQA Standard
Drawing No. WSUD-001.
Page 7 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.