Original source · versioned page text
20210080 522 Cooroy Mtn Rd IFC drawings
PROVIDE STABILISED
CONSTRUCTION ACCESS
AS PER STANDARD DETAIL
ON DWG 051
ROCK CHECK DAM
Wer === SS
a a?
SSS
So QE
Dp
o Ee
Z
SEDIMENT FENCE
491
1638RP902161
SEDIMENT AND EROSION CONTROL:
CONTRACTOR TO ALLOW FOR PROVISION OF ALL REQUIRED
SEDIMENT AND EROSION CONTROL DEVICES IN ACCORDANCE
WITH IECA AND COUNCIL POLICIES AND GUIDELINES
522
9RP864130
LEGEND:
- 000000000000 PROPOSED ROCK CHECK DAM
cee |S) eee S| = )=—PROPOSED SEDIMENT FENCE
CONSTRUCTION ACCESS
North Point [Approved Smog amg anne Project Address Tile
Me 4 wl, sigem 1522 COOROY MOUNTAIN RD EROSION AND SEDIMENT CONTROL PLAN
= =
o, = seta: [COOROY MOUNTAIN
ADAM BROUGHTON RPEQ 8915 o ‘ Q f= re
1S09001 9 18014001
For and on behalf of RECOR Pty Ltd. QUALITY ENVIRONMENT OHS
N Scale Se NSRINE COAST [BRISBANE Client Details Project Name Sheet Size
B | 10.07.24 | ISSUE FOR CONSTRUCTION aa | MP SCALE txmebecmcieen et) metres) www.recor.au| ABN 89 647 469 707 TRAVIS MCCARTHY PROPOSED DRIVEWAY UPGRADE A1
A 23.04.24 | ISSUE FOR OPW APPROVAL DK AB 1: 100 (FULL SIZE) COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's Project Number Drawing Number Revision
client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK ‘Issued For Construction’ in the revision description. 2021 0080 C050 B
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (20210080 522 Cooroy Mtn Rd IFC drawings.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.