20210080 522 Cooroy Mtn Rd IFC drawings

of 8

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                                                                                                                                                                                                                                                                                 SEDIMENT RELEASE GUIDELINES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    REPORTING




                                                                                                                                                                                                                                                                                             500 - 600mm
                                                                   PROVIDE WASH WATER FOR                                                                 1 METER MAX.                     STAR PICKETS                                                                                                                                                                                          1.   ALL RELEASES OF STORMWATER CAPTURED ONSITE, UNLESS            17. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC
       TIMBER SLEEPER OR METAL                                     TRUCKS EXITING SITE                                                                                                                                                                                                                                                                                                                OTHERWISE NOTED IN THIS STANDARD, MUST NOT EXCEED THE             MAINTENANCE AND CONTROL OF ALL STAGES OF WORK FOR
       GRID 100mm HIGH AND                                                                                                                                                                 DROP INLET                                                                                                                                                                                                 FOLLOWING LIMITS:                                                 APPROVAL BY THE SUPERINTENDENT.
       SPACED AT 300mm CTS                                         MIN LE                                                                                                                  WITH GRATE                                                                                                                                            1.5m STAR PICKETS AT MAX.                       ·    50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A MAXIMUM
                                                                             NGTH                                                                                                                                                                                                                                                                2.5m CENTRES
                                                                                  1     0m                                                                                                                                                                                                                                                                                                            CONCENTRATION;
                                                                                                     BERM 300 HIGH MIN                                                                     WIRE OR STEEL MESH
     CONSTRUCTION SITE                                                                                                                                                                                                                                                                                                                                                                           ·    TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE BACKGROUND;
                                                                                                                                                                                           (14 GAUGE x 150mm                                                                                                                                                                                     ·    pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5 EXCEPT WHERE,                            MAINTENANCE SCHEDULE
                                                                                                                                                                                           OPENINGS) WHERE
                                                                                                            EXISTING                                                                       GEOTEXTILE IS NOT                                                                                                                                      SELF-SUPPORTING                                     AND TO THE EXTENT THAT, THE NATURAL RECEIVING WATERS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               TIMEFRAME FOR
                                                                                                            ROADWAY                                                                        SELF-SUPPORTING                                                                                                                                        GEOTEXTILE                                          LIE OUTSIDE THIS RANGE.                                                              MAINTENANCE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ESC MEASURES                             COMPLETION OF
                                                                                                                                                                                                                                                                                                                                                                                                 2.   THE CONCENTRATION OF TSS RELEASED BY DEWATERING MAY                                    TRIGGER
                                                                                                                                                                                           WOVEN GEOTEXTILE                                                                                                                                                                                                                                                                                                     MAINTENANCE
                                                                                                                                                                                                                                                                                                                                                       FLOW                                           ONLY EXCEED 50mg/L WHERE IT CAN BE DEMONSTRATED AND
                                                                                                                                                                                                                                                                                                                                          DIRECTION OF
                                                                                                                                                                                                                                                                                                                                                                                                      SUPPORTED THROUGH DOCUMENTATION THAT:                                               WHEN SETTLED
     GEOTEXTILE FABRIC                                                                                                                                                                                                                                                                                                                                                                           ·    FURTHER SIGNIFICANT RAINFALL IS FORECAST TO OCCUR                                 SEDIMENT EXCEEDS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                      SEDIMENT BASIN                           WITHIN 7 DAYS OF
                                                                                                                                                                                                                                                                                                                                                                                                      BEFORE THE TSS CONCENTRATION IS LIKELY TO BE REDUCED TO                           THE VOLUME OF THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     (WHERE UTILISED)                          THE INSPECTION
                                                                   50-75mm GRAVEL BED MIN                                                                                          STAR PICKET                                                                                                                                                                                                        50mg/L.                                                                           SEDIMENT STORAGE
                                                                   200mm THICK                                                                                                     FITTED WITH                                                                                                                                                   ON SOIL, 150mm x 100mm                          ·    RELEASING A HIGHER CONCENTRATION OF TOTAL SUSPENDED                                     ZONE
                                                                                                                                                                                   SAFETY CAP                                                                                                                                                    TRENCH WITH COMPACTED                                SOLIDS WILL RESULT IN A BETTER ENVIRONMENTAL OUTCOME
                             RUNOFF FROM PAD DIRECTED TO                                                                                                                                                                                                                                                                                         BACKFILL AND ON ROCK, SET                            BY PROVIDING STORAGE FOR THE CAPTURE AND TREATMENT OF                             1/3 OF THE CAPACITY
                             SEDIMENT TRAP                                                                                                                                                                                                                                                                                                                                                                                                                              OTHER ESC                             BY THE END OF THE
                                                                                                                                                                                                                                                                                                                                                 INTO SURFACE CONCRETE                                RUN-OFF FROM THE IMMINENT RAINFALL AND RUN-OFF.                                   OF ESC MEASURES IS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        MEASURES                                     DAY
                                                                                                                                                                           WOVEN GEOTEXTILE                                                                                                                                                                                                      ·    ALL REASONABLE AND PRACTICABLE STEPS HAVE BEEN TAKEN                                   EXCEEDED
                                                                                                                       SANDBAGS
                    TEMPORARY CONSTRUCTION VEHICLE EXIT                                                                                                                                                                                                                                                                                                                                               TO TREAT THE WATER WITHIN BEST-PRACTICE TIME FRAMES;




                                                                                                                                                                                                                                                                                             600mm MIN.
                                                                                                                                                                                       RUNOFF                                                                                                                        SECTION DETAIL                                                              ·    FLOCCULENT HAS BEEN APPROPRIATELY APPLIED AND THE
                                               SCALE: N.T.S.                                                                                                                                                                                                                                                                                                                                          CONCENTRATION OF TSS IN THE CAPTURED WATER HAS
                                                                                                                                                                                       WATER WITH




                                                                                                                                                               FLOW
                                                                                                                                                                                       SEDIMENT                                                                                                                                                                                                       ALREADY SIGNIFICANTLY DECREASED.
                                                                                                                       WATERWAY                                                                                                                                                                                                                                                                  3.   FOR ALL OTHER STORMWATER RELEASES, FLOWS AND
                                                                                                                                                                                                                                                                                                                                                                                                      DISCHARGES FROM THE SITE, THE RELEASE LIMIT PRESCRIBED
                                                                    STABILISE STOCKPILE SURFACE                                                                                                                                                                                                                                  20m MAX.




                                                                                                                                                                                                                                                                         MIN. 1.5m
                                                                                                                                                                                                                                                                                                                                                                                                      IN (1A) ABOVE MUST NOT BE EXCEEDED UNLESS THE
            EARTH BANK                                                                                                EXCAVATION                                                                                                                                                                                                                                                                      DEVELOPMENT IS IN FULL COMPLIANCE WITH THIS STANDARD.
                                                                  2:1                                                                                                                                                                                                                                                                                   FLOW
                                                       X.)              SL
                                                E   (MA                   OP
                                                                             E(
                                                                                                                                                                                                                             FILTERED                                                                                                                                                            SEDIMENT CONTROL
                    FLOW                      OP                               MA                                                                                                                                             WATER                                                                  STAR PICKETS AT                                                                             1. ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN
                                            SL                                    X.)                                                                                                  GEOTEXTILE
                                      2:1                                                                                                                                                                                                                                                            MAX. 2.5m SPACINGS                                                                             ACCORDANCE WITH INTERNATIONAL EROSION CONTROL
                                                                                                                      EARTH BANK                                                       EMBEDDED 150mm                                                                                                TYPICAL                                                                                        ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE
                                                                                                                                                                                       INTO GROUND                                                                                                                                                                                                  SPECIFICATIONS.
                                                                                                                                                                                                                                                                                                                                                                                                 2. SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE
                                                                SEDIMENT FENCE                                                                                             FOR DROP INLETS AT NON-SAG POINTS,                                                                                                                                                                                       MINIMUM    REQUIREMENTS.    IT  IS   THE    CONTRACTORS
                                                                                                                                                                           SANDBAGS, EARTH BANK OR EXCAVATION USED                                                                                                                   PLAN
                                                                                                                                                                                                                                                                                                                                                                                                    RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES
                                                                                                                                                                           TO CREATE ARTIFICIAL SAG POINT                                                                                                                                                                                           AS DEEMED NECESSARY THROUGHOUT CONSTRUCTION.
               STOCKPILE CONSTRUCTION NOTES:                                                                                                                                                                                                                                                                                                                                                     3. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT
                                                                                                                            GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                                                             CONTROL DEVICES IN A FUNCTIONAL ORDER AND REPLACE ALL
               1.        PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING                                                                                                                                                                                                                                                                                                           BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL
                         VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                                       1.   FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.                                                                                                                                                                                                  OFF MAINTENANCE OF WORKS.
                                                                                                                                                                                                                                                                                                                                            DIRECTION                                            4. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO
               2.        CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                                           2.   PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.                                                                                                                              DISTURBED                                                      1.5m STAR PICKETS AT      THE SATISFACTION OF THE SUPERINTENDENT. SHALL BE
                                                                                                                                                                                                                                                                                                                                            OF FLOW
                                                                                                                                                                                                                                                                                                           AREA                                                           MAX. 2.5m CENTRES         COMPLETED AND EFFECTIVE PRIOR TO:
               3.        WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS                                   3.   IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS OR EARTH                                                                                                                                                                                          a. STRIPPING OF TOPSOIL AND GRASS.
                         THAN 2 METRES IN HEIGHT.                                                                                BANKS AS SHOWN IN THE DRAWING.                                                                                                                                                                                                                                     b. BULK EARTHWORKS TO THE SITE.
                                                                                                                                                                                                                                                                                                                                                                                                    c. SERVICES INSTALLATION.
               4.        WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE                                        4.   DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS ADEQUATE TO                                                                                                                                                                                           d. PAVEMENT CONSTRUCTION
                         FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO                                           ALLOW FOR ALL WATERS TO BYPASS IT.                                                                                                                                                                                                                              5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN
                         LESS THAN 0.10.                                                                                                                                                                                                                                                                                                                                                            PLACE UNTIL INSTRUCTION IS RECEIVED IN WRITING FROM THE
                                                                                                                                                             GEOTEXTILE INLET FILTER A                                                                                                                                                                                                              SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT
               5.        CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER                                                                                                                                                                                                                                                                                                                  CONTROL APPLICATIONS.
                                                                                                                                                                            SCALE N.T.S
                         AROUND STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.                                                                                                                                                                                                                                                                                                          6. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN
                                                                                                                                  GRADIENT OF                                                                                                                                                                                                                                                       SHALL BE READ IN CONJUNCTION WITH THE APPROVED
                                                                                                                                  DRAIN 1% TO 5%                             CAN BE CONSTRUCTED           ALL BATTER GRADES                                                                                                                                                                         DRAWINGS.
                                                      STOCKPILES                                                                                                             WITH OR WITHOUT              2(H):1(V) MAX.                                                                                   UNDISTURBED                                                                           7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO
                                                             SCALE N.T.S                                                                                                     CHANNEL                                                                                                                       AREAS                                                                                    BE OBTAINED FROM THE SUPERINTENDENT FOR THE LOCATION
                                                                                                                                                                                                                                                                                                                                                                                                    OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE
                                                                                                                                  DIRECTION
                                                                                                                                                        OF FLOW                                                                                                                                                                                                                                     TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
                                                                                                                                                                                                                                                                                                                                                                                                 8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN




                                                                                                                                                                                                                         .
                                                                                                                                                                                                                300mm MIN
                    TIMBER SPACER TO SUIT                                      KERB-SIDE INLET                                                                                                                                                                                                                                                                                                      FOUND TO BE DIFFERENT OR FAILED IN SERVICE, CORRECTIVE
                                                                                                                                                                                                                                                                                                                                                                                                    ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY
                                                                                                                                                                                                                                                                                                                                                                                                    INCLUDE AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED
                                                                                                                                                                                                                                                                                                                                                                                                    EROSION CONTROL PLANS. SUCH AMENDMENTS ARE TO BE
                                                                                                                                                                                  2m MIN                                                                                                                                                                                                            APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND
                                                                                                                                         150mm MIN




                                                                                                                                                                                                                                                                                                                                                                                                    RELEVANT.
                                                                                                                                                                  NOTE: ONLY TO BE USED AS TEMPORARY BANK                                                           SEDIMENT FENCE CONSTRUCTION NOTES:                                                                                           9. OVERALL
                                                                                                                                                                  WHERE MAXIMUM UPSLOPE LENGTH IS 80 METRES.                                                                                                                                                                                        a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE
                                                                                                                                                                                                                                                                    1.          CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL TO                                                    DIVERTED AROUND THE WORK SITE WHERE POSSIBLE.
                                                                                                                                                                                                                                                                                THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE                                                    b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE
                                                                               GRAVEL-FILLED WIRE MESH OR                         DIVERSION DRAIN CONSTRUCTION NOTES:                                                                                                           DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE                                                            INSTALLED AND BE OPERATIONAL BEFORE COMMENCING
                                                                               GEOTEXTILE "SAUSAGE"                                                                                                                                                                             CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF                                                           UP-SLOPE EARTHWORKS.
                                                                                                                                  1.     BUILD WITH GRADIENTS BETWEEN 1% AND 5%.                                                                                                CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN                                                     c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED,
                                                                                                                                                                                                                                                                                STORM EVENT, USUALLY THE 10-YEAR EVENT.                                                                                EXPOSED SURFACES TO BE EITHER MULCHED, COVERED
                                       OVERFLOW                    TIMBER SPACER                                                  2.     AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.                                                                                                                                                                                               WITH EROSION CONTROL BLANKETS OR TURFED IF
       RUNOFF
                                                                   TO SUIT                                                                                                                                                                                          2.          CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR THE                                                    EARTHWORKS ARE EXPECTED TO BE DELAYED FOR MORE
       WATER WITH                                                                                                                 3.     ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER                                                                                                                                                                                                        THAN 14 DAYS.
                                                                                                                                                                                                                                                                                BOTTOM OF THE FABRIC TO BE ENTRENCHED.
       SEDIMENT                                                                                                                          IRREGULARITIES THAT COULD IMPEDE WATER FLOW.
                                                                                                                                                                                                                                                                    3.          DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT                                             SEDIMENT FENCE
                                                                                                                                  4.     BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                                                                               THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE                                                    10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION
                                                                                                                                         CROSS-SECTIONS, NOT "V" SHAPED.                                                                                                        FITTED WITH SAFETY CAPS.                                                                                             REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION
          SEDIMENT                                                                                                                                                                                                                                                                                                                                                                                   AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWINGS
                                                                                                                                  5.     ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.                                                                    4.          FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS                                                      SF-01 AND SF-02 SEDIMENT FENCE.
        GRAVEL-FILLED WIRE MESH                                              FILTERED WATER                                                                                                                                                                                     ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH                                              TEMPORARY CONSTRUCTION ENTRY/EXIT
                                                                                                                                  6.     COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS                                                                           WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE                                                        11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND
        OR GEOTEXTILE "SAUSAGE"
                                                                                                                                         OF CONSTRUCTION.                                                                                                                       GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF                                                    SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL
                                                                                                                                                                                                                                                                                SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.                                                                    ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD
                                                                                                                                                                      DIVERSION DRAIN                                                                                                                                                                                                                DRAWINGS EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD
                                                                                                                                                                                                                                                                    5.          JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.                                                      (CONSTRUCTION SITES ONLY), EXIT-03 - ROCK PADS FOR
                    MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:                                                                                                       SCALE N.T.S
                                                                                                                                                                                                                                                                                                                                                                                                     BUILDING SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION EXIT -
                                                                                                                                                                                                                                                                    6.          BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT                                                       VIBRATION GRID.
                    1.     INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                                                              WRAP FILTER                                                                                                                                                                                           KERB INLET
                                                                                                                                                                                                                                                                                THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                                                                                                           CLOTH OVER GRATE                                                                                                                                                                                      12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION REFER
                    2.     FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE                                                                                                                                                                                                                                                                                                                           TO     INTERNATIONAL   EROSION     CONTROL      ASSOCIATION
                           MESH LONGER THAN THE LENGTH OF THE INLET PIT AND                                                                                                                                                                                                                                   SEDIMENT FENCE                                                                         AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING
                           FILL IT WITH 25mm TO 50mm GRAVEL.                                                                                                                                                                                                                                                        SCALE: N.T.S.                                                                    ESC-03 KERB INLET SEDIMENT TRAPS
                                                                                                                                                                                                                                                                                                                                                                                                 REVEGETATION
                    3.     FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH x                                                                                                                                                                                                                                                                                                                   13. FOR REVEGETATION STANDARD SPECIFICATION REFER TO
                           400mm WIDE.                                                                                                                                                                                                                                                                                                                                                               INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA
                                                                                                                                                                                                                                                                                                                                                                                                     (IECA)    BEST   PRACTICES    STANDARD     DRAWING      R-01
                    4.     PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A                                                                                                                                                                                                                                                                                                                        REVEGETATION GENERAL.
                           100mm SPACE BETWEEN IT AND THE KERB INLET. MAINTAIN                                                                                 WRAP FILTER CLOTH                                                                                                                                                                                                                 FIELD INLET
                           THE OPENING WITH SPACER BLOCKS.                                                                       RUNOFF                        OVER GRATE                                                                                                                                                                                                                        14. FOR FIELD INLET STANDARD DETAIL AND SPECIFICATION REFER
                                                                                                                                 WATER WITH                                                                                                                                                                                                                                                          TO     INTERNATIONAL   EROSION     CONTROL      ASSOCIATION
                    5.     FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT                                                         SEDIMENT                                                                                                                                                                                                                                                            AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING
                           BYPASSING THE FILTER.                                                                                                                                                                                                                                                                                                                                                     ESC-02 GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP.
                                                                                                                                                                                                                                                                                                                                                                                                 OPERATION AND MAINTENANCE
                    6.     SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE                                                                                                                                                                                                                                                                                                                    15. IN ACCORDANCE WITH ICEA GUIDELINES, ALL ESC MEASURES
                           MESH OR GEOTEXTILE PROVIDING THEY ARE PLACED SO                                                                                                                                                                                                                                                                                                                           SHALL BE INSPECTED: · AT LEAST DAILY (WHEN WORK IS
                                                                                                                                                                                FILTERED                                                                                                                                                                                                             OCCURRING ON SITE) OR WEEKLY (WHEN WORK IS NOT
                           THAT THEY CAN FIRMLY ABUT EACH OTHER AND                                                                                                              WATER
                           SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                                                                                                                                                                                                                                                                                                OCCURRING ON SITE) · WITHIN 24 HOURS OF EXPECTED RAIN;
                                MESH & GRAVEL INLET FILTER                                                                               GEOTEXTILE INLET FILTER TYPE B                                                                                                                                                                                                                              AND · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF
                                                                                                                                                                                                                                                                                                                                                                                                     SUFFICIENT INTENSITY AND DURATION TO MOBILISE SEDIMENT
                                              SCALE N.T.S                                                                                                         SCALE N.T.S                                                                                                                                                                                                                        ON SITE).
                                                                                                                                                                                                                                                                                                                                                                                                 16. IN ACCORDANCE WITH ICEA GUIDELINES, MAINTENANCE OF ESC
                                                                                                                                                                                                                                                                                                                                                                                                     MEASURES SHALL OCCUR IN ACCORDANCE WITH THE
                                                                                                                                                                                                                                                                                                                                                                                                     FOLLOWING TABLE:

                                                                                                              North Point        Approved                                                                                                                                                                                                                          Project Address                                                      Title

                                                                                                                                                                                                                                                                                                                                                                   522 COOROY MOUNTAIN RD                                               EROSION AND SEDIMENT CONTROL NOTES
                                                                                                                                                     ADAM BROUGHTON RPEQ 8915
                                                                                                                                                                                                                                                                                                                                                                   COOROY MOUNTAIN
                                                                                                                                 For and on behalf of RECOR Pty Ltd.
                                                                                                                                 Scale                                                                                                                           ENGINEERING & PROJECT SERVICES                                                                    Client Details                                                       Project Name                                                                              Sheet Size
                                                                                                                                                                                                                                                                    SUNSHINE COAST | BRISBANE
 B     10.07.24     ISSUE FOR CONSTRUCTION                                                    AB    MP                                                                                                                                                             www.recor.au | ABN 89 647 469 707                                                               TRAVIS MCCARTHY                                                      PROPOSED DRIVEWAY UPGRADE                                                                   A1
 A     23.04.24     ISSUE FOR OPW APPROVAL                                                    DK    AB
                                                                                                                                                                          N.T.S                                               COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's                                                                                       Project Number                               Drawing Number                                Revision

                                                                                                                                                                                                                                                                                                                                                                                                                                        20210080                                     C051                                            B
                                                                                                                                                                                                                              client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as

Rev     Date                         Revision Description                                    Drawn Check                                                       DO NOT SCALE, IF IN DOUBT ASK                                                                        'Issued For Construction' in the revision description.

Log in to download the original (20210080 522 Cooroy Mtn Rd IFC drawings.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.