Attachment H - Environmental Values Assesment
Callaghan and Toth Consulting Engineers______________________________________________________
Biodiversity Overlay
b) the development minimises the total
footprint within which all activities,
buildings, structures, driveways and
other works are contained; and
c) the development is located in areas of
low ecological value over other areas,
to the greatest extent practicable.
O4 Wetlands are protected from removal S4.1 A minimum separation distance of 100m is Council mapping does not show the site as a wetland.
or degradation and any adverse impacts provided between a wetland and any adjacent However SPP mapping shows part of Cooroy Creek
on wetlands are prevented, minimised or development or use. adjacent to the site as a High ecological significance
mitigated by- wetland
a) maintaining adequate separation
between the wetland and any adjacent The works are within 3 to 10m from the top of bank of
development or use; Cooroy Creek which is north of the proposed new
b) minimising any modification of the Hinterland Playground. This separation distance from
natural characteristics of the wetland, park uses to the creek, are as per the current open space
including the topography, surface and use on the site.
groundwater hydrology, water quality
and flora and fauna species; There will be no changes to flows for Cooroy Creek as
c) preventing any new development shown in the Flood Study by Hydrology and Water.
within wetlands;
d) minimising access to the wetland; There will be no new accesses into the retained
e) minimising impacts associated with vegetation following completion of works or changes to
pest insect control and invasion by the surface levels in the retained vegetation areas.
undesirable plant species; and
f) providing for the rehabilitation and The landscaping of the playground will utilise native
replanting of degraded wetlands. vegetation species and will allow for removal of any
existing weeds across the site.
Overall the native vegetation density will increase
following landscaping of the playground compared to the
current situation on site, that is a grassed open area.
Riparian Zones The site falls within the Riparian Buffer Areas on the
O5 The biodiversity and ecosystem S5.1 No new development occurs on, or partly on, Biodiversity Overlay.
values of watercourses, drainage lines, premises indicated as Riparian Buffer Area on
wetlands and adjacent riparian zones are Biodiversity Overlay Maps OM1.1 to OM9.1, except The proposed works will not require clearing of existing
protected by – for- vegetation to construct the playground.
a) avoiding any new development in the a) temporary use of the land; or
riparian buffer area; b) infrastructure which provides access to a The Cooroy Creek riparian vegetation has been subject to
b) retaining aquatic and terrestrial habitat watercourse for recreational purposes; a long-term revegetation program by Noosa District
in riparian zones; Landcare on behalf of Council to improve connectivity of
1. X:\JOBS\CT Projects in progress\2001 env reports for cooroy playground carparks\Correspondence\Reports\ENV\Playground\Biodiversity Overlay_HInterlandPlayground.docx pg. 9
pg. 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment H - Environmental Values Assesment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.