Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (23.8 MB): may take a few minutes to open.
www.ac ss.gs
+GILBERI
SlJT1-ERI.
The integration of water use in its area.
3 Approach and
In developing and implementing the plan, the local
methodology government must have regard to the SEQ
Regional Plan and any sub-regional total water
cycle management plans prepared under the SEQ
An overview of the approach and methodology
Regional Plan. Key issues for the plan to consider
adopted for this study is outlined below:
include (Section 19 (4)):
3.1 Methodology A strategy for water demand management;
Ways to increase the recycling of waste water
The methodology adopted for the IWCM
and stormwater, e.g. for industrial or
investigations included the following key activities:
agricuHural use; and
Review and detailed analysis of rainfall data The impacts of existing and future land-use on
applicable to the project area (3stations); water cycle management.
Development of conceptual IWCM options for
It is also important to note the requirements of the
the project;
Review of IWCM options with respect to site Oueensland Development Code (ODC)MP 4.2-
Water Savings Targets for Class 1 buildings
constraints;
Review of water demand off-sets and unit connected to a reticulated town water supply
demands in SEQ; system, where Class 1 (a)means ’one or more
Formulation of water balance model and output buildings, which in association, constitute a single
for a typical detached, single-family residence dwelling (detached)or one of a group of attached
for a range of rain tank sizes; dwellings’, and where Class 1 (b)means ’a
Refine IWCM concepts to 4 options, prepare boarding house, guest house, hostel, etc., with
schematics and discuss with infrastructure total floor areas not exceeding 300m2, or in which
not more than 12 persons would ordinarily be
planning engineers;
resident’.
Selection of key focus areas for IWCM after
consideration of all site limitations; and
A rainwater tank is required for these buildings,
Precinct modelling of rainwater harvesting to
with a minimum storage volume of 5,000L for
determine potential water demand off-sets for
detached Class 1 buildings and 3,000L for Class 1
each precinct.
buildings other than detached dwellings. The
minimum roof area for rain collection should be
3.2 Legislative and Institutional Context the lesser of 100m2 or 50% of the total roof area.
Part 6, Division 2 (Section 19) of the The rain tanks should be connected to the cold-
Environmental Protection (Water)Policy 2009 water plumbing for toilet flushing and washing
(Reprint No. 10 of 29 June 2012) requires a machine use internally and for garden irrigation
distributor-retailer’s participating local government externally. The applicable water savings targets
to develop and implement an environmental plan for the Noosa on Weyba area are:
about water cycle management for its local
70,000 L/year for new, detached dwellings;
government area. In the case of Noosa on and
Weyba, the distributor-retailer is Unitywater and 42,000 L/year for all other new Class1
the participating local government is the Sunshine
buildings.
Coast Regional Council.
The provisions for this legislative and institutional
The total water cycle management plan must
context are therefore key considerations for the
consider the following (Section 19 (2)): IWCM Plan for Noosa on Weyba.
The collection, treatment and recycling of
waste water, stormwater, ground water and
other water sources; and
12 AGRICULTURE WATER ENVIRONMENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 23.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.