SUT1-ERJ.AN)
The closest sewage treatment plant (STP)is
4 Key considerations for the Noosaville STP, off Eenie Creek Road,
developing IWCM Options approximately 6km by road north east of the
project area;
the bulk sewerage north of the project area
4.1 Type and extent of the development comprises both gravity and pumping mains
delivering sewage to the Noosaville STP;
The Noosa on Weyba project comprises a range
potable water supply would have to be
of residential development precincts, including
sourced from the Noosaville water supply
freestanding dwellings, townhouses and mixed-
zone and would be subject to the
use areas with low-rise apartment blocks. As is
requirements of Unitywater.
evident in Figure A2 (Appendix 1), the proposed
BDOA comprises the majority of the land under
4.3 Site constraints
consideration, while the developable areas are
Site-related factors impacting on the IWCM
primarily located on previously farmed pastures
and grasslands. The project area is split into considerations are as follows:
eastern and western portions by Walter Hay Drive The low-lying areas of the site are shallow-
and a number of the residential precincts are
graded and poorly drained, making it difficult
separated by drainage lines and/or conservation to utilize undeveloped land area for retention
corridors. Existing developments in close basins or any form of effluent disposal;
proximity to the project area are located north- Much of the designated ’greenspace’within
west and south of the land under consideration. the proposed development areas (i.e.
Lake Weyba is located on the eastern boundary of excluding areas within the BDOA) cannot
the project area and all natural drainage from the
support continuous inundation, again limiting
project area currently flows into the lake. proposals for retention basins or any form of
effluent disposal;
4.2 Proximity to bulk water and The proposed development area is outside
wastewater services the current Noosa Plan Priority Infrastructure
The project area all falls outside of the Priority Area and thus bulk servicing requirements for
Infrastructure Area (PIA)for the Noosa Plan, water supply, and wastewater conveyance,
treatment and disposal need to be carefully
although the northern lot boundaries of the project
area do bound to the PIA. There are no bulk water
considered to reduce costs, as well as to
minimise any environmental impacts.
or wastewater services within the project area.
This does open up opportunities for consideration
In considering the IWCM options, it was, in the
of IWCM strategies which will reduce the
first instance, important to recognize the distance
infrastructure charges associated with providing or
of the proposed development areas from the
connecting to existing bulk water and wastewater
existing bulk services. There was initially
services.
uncertainty as to whether or not sewage could be
The project engineers, Cardno, have reported accepted at the Noosaville STP from the Noosa
on Weyba development due to current capacity
separately on the investigations of the water
constraints and uncertainty regarding the
supply and wastewater systems serving the
Tewantin and Noosaville areas, however key scheduling of the necessary augmentations. The
site constraints on effluent disposal do however
points to note are the following:
ultimately make any sustained on-site sewage
The water and wastewater Distribution-
treatment and disposal very problematic.
Retailer for the project area is Unitywater,
serving the Sunshine Coast Regional Council In the interests of completeness therefore, various
and all Local Councils within the SCRC area treatment and re-use alternatives were identified
of jurisdiction; and included in the IWCM options.
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 23.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.