Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208

Plans and drawings: the text below has words only, no drawings.

Very large file (23.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
www.ac    ss.gs                                                                          +GILEEHI
                                                                                       SUT1-ERJ.AN)



5.5      Selection of preferred option                potentially significant capital cost and its reliance
                                                      on the provision of suitable land capable of
In selecting the most appropriate option(s) for
                                                      sustaining long-term irrigation.
further analysis, this IWCM investigation

acknowledged the ongoing uncertainty as to            Options 1, 2 and 3 assume on-site sewage
whether sewage generated by the development
                                                      treatment is required and would have to carry both
could feasibly be pumped to the Noosaville STP.
                                                      the capital and operating costs of that assumption.
In addition, the selection process was informed by
                                                      They each maximize the benefits of rain water
the soil survey, groundwater and stormwater
                                                      harvesting (from communal or domestic systems
studies that identified potential constraints in
                                                      respectively) which improves the management of
respect of the sustained, on-site use of the          both stormwater quality and quantity. Communal
various effluent streams (treated sewage, treated
                                                      rainwater harvesting systems can however pose
stormwater and communal rain tanks).
                                                      operational problems for staged developments
                                                      where both inflow rates and utilisation rates are
The IWCM options represented a range from
                                                      low.
maximum on-site use of effluent streams (i.e.

Option 1) through to a focus on domestic rain         The domestic rain tank system in Option 4 was
tanks and bio-retention swales and basins for
                                                      selected for further analysis as it lends itself to
stormwater quality management whilst minimising
                                                      staged development and is capable of achieving
the need for sustained open space irrigation
                                                      compliance with the demand off-set targets
(Option 4).                                           specified in the Queensland Development Code.
In the event that a connection to the Noosaville
                                                      Option 4 also includes the construction of bio-
                                                      retention swales and basins for stormwater
STP is unavailable (at least in the early stages of
                                                      management, particularly to improve the quality of
residence on the site), sewage would have to be
                                                      stormwater runoff. Although the headworks costs
treated at an on-site package plant, including the
                                                      to secure connections to both the municipal water
recycled water reticulation. In the alternative,
                                                      and wastewater systems require further
provisions would need to be made to tanker
                                                      investigation, Option 4 can achieve a prudent and
sewage to the Coolum STP until such time as a
                                                      effective balance for IWCM by reducing impacts
connection to the Noosaville STP could be
                                                      on the surrounding areas and sizing rain water
achieved. It must be noted that the cost of
                                                      tanks to achieve substantial off-sets of potable
pumping sewage through to the Noosaville STP
                                                      water demand from the municipal supply system.
would not be insignificant but would allow for
effluent disposal through an existing system.
                                                      The results of further analyses associated with

                                                      Option 4 are presented in Section 6.
Option 1, which includes a full stormwater
harvesting treatment and distribution system, was
not selected for further analysis on the basis of




1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO    _
                                                                               IWCM                         15

Used in these records

About this file

File size
23.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12_0208.pdf · 23.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.