5.5 Selection of preferred option potentially significant capital cost and its reliance
on the provision of suitable land capable of
In selecting the most appropriate option(s) for
sustaining long-term irrigation.
further analysis, this IWCM investigation
acknowledged the ongoing uncertainty as to Options 1, 2 and 3 assume on-site sewage
whether sewage generated by the development
treatment is required and would have to carry both
could feasibly be pumped to the Noosaville STP.
the capital and operating costs of that assumption.
In addition, the selection process was informed by
They each maximize the benefits of rain water
the soil survey, groundwater and stormwater
harvesting (from communal or domestic systems
studies that identified potential constraints in
respectively) which improves the management of
respect of the sustained, on-site use of the both stormwater quality and quantity. Communal
various effluent streams (treated sewage, treated
rainwater harvesting systems can however pose
stormwater and communal rain tanks).
operational problems for staged developments
where both inflow rates and utilisation rates are
The IWCM options represented a range from
low.
maximum on-site use of effluent streams (i.e.
Option 1) through to a focus on domestic rain The domestic rain tank system in Option 4 was
tanks and bio-retention swales and basins for
selected for further analysis as it lends itself to
stormwater quality management whilst minimising
staged development and is capable of achieving
the need for sustained open space irrigation
compliance with the demand off-set targets
(Option 4). specified in the Queensland Development Code.
In the event that a connection to the Noosaville
Option 4 also includes the construction of bio-
retention swales and basins for stormwater
STP is unavailable (at least in the early stages of
management, particularly to improve the quality of
residence on the site), sewage would have to be
stormwater runoff. Although the headworks costs
treated at an on-site package plant, including the
to secure connections to both the municipal water
recycled water reticulation. In the alternative,
and wastewater systems require further
provisions would need to be made to tanker
investigation, Option 4 can achieve a prudent and
sewage to the Coolum STP until such time as a
effective balance for IWCM by reducing impacts
connection to the Noosaville STP could be
on the surrounding areas and sizing rain water
achieved. It must be noted that the cost of
tanks to achieve substantial off-sets of potable
pumping sewage through to the Noosaville STP
water demand from the municipal supply system.
would not be insignificant but would allow for
effluent disposal through an existing system.
The results of further analyses associated with
Option 4 are presented in Section 6.
Option 1, which includes a full stormwater
harvesting treatment and distribution system, was
not selected for further analysis on the basis of
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 23.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.