Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208

Plans and drawings: the text below has words only, no drawings.

Very large file (23.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                           www.ac   ss.gs
      +GILBERI
SlJT1-ERI.


                                                                   Table 6.1.2 Monthly rainfall statistical summary
6         Results           -


                                Analysis of                        (mm)Noosaville (SILO)
          rainwater harvesting option                              Month        Average       Median        95%         I
                                                                   January      222.5         169.7         612.9

                                                                   February     240.7         178.5         657.3
As detailed in Section 5, the IWCM option
                                                                   March        242.5        202.3          550.7
selected for further analyses minimises the
                                                                   April        175.3         153.7         433.1
requirement for sustained on-site use of the
effluent streams and concentrates on the systems                   May          158.3         138.1         363.6
that enable demand off-sets from the potable                       June         115.4        81.6           346.3
supply network and maximise stormwater quality                                  86.6         59.7           242.6
                                                                   July
and quantity benefits. The further investigation of
                                                                   August       61.0         49.1           146.3
the IWCM systems therefore focused on the rain
tank water balance characteristics and demand                      September    64.2         52.4           159.7

off-sets possible for each precinct.                               October      93.0         79.8           224.3

                                                                   November     115.7        95.8           253.6
6.1       Rainfall statistical summary
                                                                   December     160.3         148.3         355.9
This assessment used rainfall data from a number
                                                                   Table 6.1.3 Annual rainfall statistical summary
of locations in the Noosa Shire, including
Tewantin RSL Park, Eumundi-Crescent Road and                       (mm)Tewantin RSL Park
                                                                   Tewantin RSL Park rainfall statistics
Noosaville. Figure C1 in Appendix 1 shows the
location of these rainfall gauging stations in                     Period                             1996-2012

relation to the Noosa on Weyba development site.                   Average                             1,637.6
                                                                   Median                              1,455.8
Tables 6.1.1 to 6.1.6 (on this and following pages)                Standard deviation                   488.5
provide a summary of the rainfall data utilised for                95%                                 2,508.5
this assessment. It should be noted that the SILO
                                                                   75%                                 1,896.8
rainfall data is interpolated from measured data
                                                                   25%                                 1,310.9
from adjoining stations.
                                                                   5%                                  1,176.0
Table 6.1.1 Annual rainfall statistical summary
                                                                   Table 6.1.4 Monthly rainfall statistical summary
(mm)Noosaville (SILO)
Noosaville (SILO)rainfall statistics
                                             1                     (mm)Tewantin RSL
                                                                   Month        Average       Median        95%
Period                            1889-2912
                                                                   January      209.8         168.2         534.8
Average                           1,735.6
                                                                   February     235.2         179.3         657.3
Median                            1,626.2
                                                                   March        221.6         196.4         502.8
Standard deviation                472.9
                                                                   April        173.3         153.7         414.9
95%                               2,333.6
                                                                   May          157.6         134.9         363.6
75%                               2,066.0
                                                                   June         115.5        81.1           334.5
25%                               1,419.5
                                                                   July         83.6         60.0           242.6
5%                                1,081.2
                                                                   August       64.9         49.1           151.5

                                                                   September    60.2         42.3           159.9

                                                                   October      95.0         79.8           251.9
1
    The Noosaville data is taken from the SILO data drill and as
                                                                   November     116.1        99.1           239.8
such is interpolated. The coordinates of this rainfall location
have been approximated to the western bank of Lake Weyba
                                                                   December     160.7         147.4         355.9
(i.e. the site location).




16                                                                              AGRICULTURE WATER ENVIRONMENT

Used in these records

About this file

File size
23.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12_0208.pdf · 23.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.