Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208

Plans and drawings: the text below has words only, no drawings.

Very large file (23.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                   www.ac    ss.gs
         +GILBERI
    SlJT1-ERI.


    Different tank sizes were assessed for each of the     inflow

    rainfall data sets reviewed in section 6.1 and for
                                                           (8)Less spill       85,785     81,229      76,268
    the assumptions presented in tables 6.2.1 and
                                                           (C)Total
    6.2.2. A summary of these assessments is                                   53,004     57,542      62,460
                                                           available for use
    presented in Tables 6.2.3, 6.2.4 and 6.2.5. The
    rainfall tank assessment is based on the daily         (D)Demand           72,301     72,301      72,301

    data for each location and has been modelled on        (E)Potable
    a   daily time-step.                                   supplemented        19,255     14,716      9,799
                                                           demand
    Table 6.2.3 Average annual rainfall balance for
    Noosaville (SILO)
                                                           6.3      Precinct approach    -
                                                                                           total catchment
I   Noosaville                                                      rainfall capture and reuse
                           3kL Tank   5kL Tank   10kL
    Annual Total (L)                                       A catchment scale rainfall tank assessment was
                                                 Tank
                                                           undertaken to determine the total rainfall capture
    (A)Total rainfall                                      and re-use for the site. This forms part of the
                           156,204    156,204    156,204
    inflow
                                                           preliminary planning process of integrated water
    (8)Less spill          95,933     91,730     87,289    cycle management for Noosa on Weyba. The
                                                           rainfall tank assessment is based on the daily
    (C)Total
                           60,247     64,434     68,915
    available for use                                      rainfall data assumed for the development area
                                                           and has been modelled on a daily time-step. The
    (D)Demand              72,301     72,301     72,301
                                                           rainfall assessment has been based on the
    (E)Potable
                                                           proposed land use precinct planning presented in
    supplemented           12,051     7,864      3,464
    demand
                                                           Figure A2 in Appendix 1.

    Table 6.2.4 Average annual rainwater tank              The assessment for each of the precincts (with
    balances for Tewantin RSL park rainfall station        the exception of Precincts C and E(b)), has been
                                                           based on the assumption of one (1)freestanding
I Tewantin RSL Park
                                                           tank per dwelling. For Precinct C, the connected
                           3kL Tank   5kL Tank   10kL
    Annual Total (L)                                       roof area of the apartment buildings has been
                                                 Tank
                                                           based on an assumption of four (4), three-storey
    (A)Rainfall
                           145,007    145,007    145,007   buildings of 12 or 13 units in each block. The
    inflow
                                                           mixed-use would comprise retail/commercial
    (8)Less spill          86,304     81,633     76,371
                                                           space on the ground floor of each block and on

    (C)Total                                               the apartments above. The roof area for tank
                           58,515     63,061     68,011
    available for use                                      inflow has been calculated on 7 apartments per
                                                           level with individual floor areas of 80m2 giving a
    (D)Demand              72,301     72,301     72,301
                                                           total roof area of 560m2 per building. Each
    (E)Potable
                                                           apartment building within Precinct C has been
    supplemented           13,600     9,054      4,104
                                                           assessed on the assumption of using three (3)
    demand
                                                           10kL rainwater tanks.


    Table 6.2.5 Average annual rainwater tanks             The assumptions for the various analyses are

    balance for Eumundi-Crescent Road rainfall station     presented in Tables 6.3.1. 6.3.2 and 6.3.3 and
I Eumundi-Crescent Road                                    present the results of the annual average rainfall
                                                           tank performance by precinct using data from the
                           3kL Tank   5kL Tank   10kL
    Annual Total (L)                                       Noosaville and Tewantin RSL Park rainfall
                                                 Tank
                                                           stations.
    (A)Rainfall            138,816    138,816    138,816




    18                                                                     AGRICULTURE WATER ENVIRONMENT

Used in these records

About this file

File size
23.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12_0208.pdf · 23.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.