Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208

Plans and drawings: the text below has words only, no drawings.

Very large file (23.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
    www.ac    ss.gs                                                                                     +GILEEHI
                                                                                                      SUT1-ERJ.AN)



    Table 6.1.5 Annual rainfall statistical summary      Table 6.2.2 Daily        usage2
    (mm)Eumundi-Crescent Road                            Daily usage                                                               I
I   Eumundi-Crescent Road rainfall statistics            Toilet, bath & shower            21.1 (Iitres/person/day)

    Period                               1898-2012       Irrigation                        18.6 (Iitres/person/day)

    Average                                1,535.5       Clothes washing                  30      (I it res/person/day)
    Median                                 1,576.4       Total daily usage                69.7 (Iitres/person/day)

    Standard deviation                     593.1         Total                             198 litres/household/day
                                                                                          total from rainwater tank
    95%                                   2,327.9
    75%                                    1,908.5       The total tank inflow (A)is equal to the total
    25%                                    1,240.8       rainfall over the roof area multiplied by the roof

    5%                                     156.1         runoff coefficient of 0.9. The volume of spill (8)is

                                                         equal to the volume of inflow exceeding the tank
                                                         volume i.e. the spill is equal to the tank volume
    Table 6.1.6 Monthly rainfall statistical summary
                                                         from the end of the previous time-step plus the
    (mm)Eumundi-Crescent Road
                                                         inflow, less the demand from the current time-
I Month               Average   I Median       95%
                                                         step. The demand (outdoor and domestic) (D)is
    January           214.7      165.4         614.0     supplied in the first instance from tank supply (C)
                                                         and if required, supplemented from the municipal
    February          228.4      198.0         581.4
                                                         potable supply system (E).
    March             221.4      169.7         530.9

    April             142.6      113.4         408.8     The rainwater tank balance model configuration is

                                                         presented in Figure 6.2.1.
    May               123.8      109.9         322.7

    June              92.8       62.5          259.1

    July              71.5       49.5          225.6

    August            53.7       33.7           128.6

    September         52.6       38.0           148.0
                                                          Potabte

    October           87.4       73.5          235.1      Supplemented
                                                         demand
                                                                                                                             u
    November          109.1      86.8          271.4                                                                          Spitt


    December          154.2      129.1         365.7



    6.2      Rainwater tank assessment                                                 [Domestic + Outdoor use)



    A daily rainwater tank balance was assessed
                                                         Figure 6.2.1 Rainwater tank balance model
    under the assumptions outlined in Tables 6.2.1       configuration
    and 6.2.2.
                                                         The following equations provide a summary:
    Table 6.2.1 Assumptions used in assessment of
                                                         (A)Roof Inflow (8)Spill (C)Total available for
                                                                              -
                                                                                              =

    daily rainwater tank balance
                                                         use (assuming the tank is empty at the start of the
I Daily rainwater tank balance                           water balance calculation).
    Roof area                    100m2
    Roof runoff coefficient     0.9
                                                         (D)Demand (C)Rain tank supply
                                                                          -
                                                                                                                  =
                                                                                                                      (E)Potable
                                                         supplemented demand
    Initial tank volume         o kL

    Density                     2.84 persons/dwelling    2
                                                             Gold Coast Domestic Water End Use Study (Willis, R et. AI)

                                                         (2009).




    1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO        _
                                                                                       IWCM                                    17

Used in these records

About this file

File size
23.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12_0208.pdf · 23.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.