Council archive · source document
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (23.8 MB): may take a few minutes to open.
Town
water
supply
v
I
v
I
v
I
v
I
v
I
v
I
v
I
v
Potable town water used
J for most indoor uses
I
v
I
v
I
Roof water v
I
v
I
On-site rainwater storage tank v
I
plumbed for toilet flushing, laundry and v
trickle top-up from town mains I
v
I
v
Tank overflow
I
v
^
I
v
1 L<_<_<_<_<_<_ <-<-<-<-<-<-<-<-<-<-<-<-<-<-<-<~
v
1
v
I" Development sewage
v
Overflow
~
Off-site
municipal <-<-<-<-<-<-<-<-C:lJ
Municipal
sewage
Bioretention pond
Harvested storm water
storage tank or dam
sewage treatment plant Main pump station
in development
v V’
V
V
1
1
I
I nfi Itration
to groundwater
1
Sewage effluent
to creek Managed
release
to creek
BRISBANE LEGEND SOURCES PROJECT CLIENT DRAWING Brisbane Sydney Melbourne and regions
GPO box 9856 Brisbane OLD 4001 NOOSA-ON-WEYBA NORTH BROOK TOTAL WATER CYCLE
Email [email protected]
0738523999 CORPORATION MANAGEMENT
PTY LTD OPTION 4
www.access.gs
SCALE DATE DRAWN CHECKED PROJECT NO DRAWING NO
Not to scale 20/07/2012 SPD RHS 10838 Figure B4 Agriculture.Water.Environment.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 23.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.