Skip to the record
For the highest quality transcripts.

Council archive · source document

Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208

Plans and drawings: the text below has words only, no drawings.

Very large file (23.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                           601     Brisbane Sydney Melbourne and regions




A
ORIENTATION
NORTH



LEGEND
                                                   Agriculture. Water.
                                                   Environment.

a        Rainfall station locations



aSewage            plants (STP)
                  treatment



K:I      Water treatment
                 plant (WTP)


a        Main localities



_ Proposed development             area




_ Bodiversity        offset area




SOURCES


Image base: Google Earth Pro 2012




                                                                                       PROJECT

                                                                    NOOSA-ON-WEYBA


                                                                                        CLIENT

                                                                        NORTHBROOKE
                                                                         CORPORATION
                                                                                   PTY LTD

                                                                                      DRAWING

                                                                    RAINFALL STATION
                                                                   AND STP LOCATIONS
                                                                                  FOR IWCM


                                                         SCALE           DRAWN        CHECKED
                                                   1 :125 000@A3            SPD            RHS

ROBINA
                                                          DATE       PROJECT NO     DRAWING NO
PO Box 4115 Robina QLD4230            0755789944      20/07/2012          10838        Figure C1
Email [email protected]             www.access.gs

Used in these records

About this file

File size
23.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12_0208.pdf · 23.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.