Council archive · source document
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (23.8 MB): may take a few minutes to open.
Roof
drainage
~~j First-flush
Sieve
\l \l
Sieve
’.
Overflow
-
sump
House
supply
,;.~-)
5000 L 5000 L
I
_j_
----,---, Gound
1’<:’. :.~’:::;\i’:), :,"/.’.’::r,-".:"’::~:",~>:.. ;~:.: !..;..; ’,;’.:.’;-;:.’,- .. ,"_
,t ./’0’\
.
.’.....;
"’,’ ~
"""’,
Pump Level
I I
ABOVE GROUND RAINWATER STORAGE TANK To
Tank type and dimensions to be confirmed with manufacturer and site constraints
-----=-..stormwater
system
Roof House
drainage supply
! 1 Gound
Level
Overflow To
~stormwater
First-flush
system
sump
5000 L 5000 L
’:’
.-.: :’:,3;’;.’,j",:; .:r,
.
.
~); ":.<:t;..::~: ’:- :-. ,-’~,-’i:. !_.-// ~:.::-\ :’~-::
UNDERGROUND RAINWATER STORAGE TANK
Tank type and dimensions to be confirmed with manufacturer and site constraints
PROJECT CLIENT DRAWING Brisbane Sydney Melbourne and regions
NOOSA-ON-WEYBA NORTH BROOK RAINWATER
CORPORATION STORAGE TANKS
PTY LTD
SCALE DATE DRAWN CHECKED PROJECT NO DRAWING NO
Not to scale 20/07/2012 SPD RHS 10838 Figure C2 Agriculture.Water.Environment.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 23.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.