www.ac ss.gs +GILBERI
SlJT1-ERlAN)
SUMMARY
Northbrook Corporation Pty Ltd commissioned Gilbert & Sutherland
Pty Ltd (G&S)to prepare an Integrated Water Cycle Management
(IWCM)Plan for the proposed Noosa on Weyba development,
Weyba Downs, Queensland. This involved an initial assessment of
the IWCM options, a detailed analysis of the rainfall in the Noosa on
Weyba development area, an analysis of the rainfall harvesting
water balance for various rain tank sizes as well as the rainfall
harvesting performance for the proposed development precincts for
a defined rain tank size.
Soil, groundwater and open area space constraints precluded the
sustained irrigation or in-situ use of wastewater effluent and/or
treated stormwater runoff, with the result that the IWCM Plan is
focused on the provision of rainfall harvesting tanks at all
residences, townhouses and apartment blocks. This involves the
installation of rain tanks at each dwelling, or groups of tanks serving
blocks of units. These tanks will provide water for toilet cisterns,
garden irrigation and laundry use at each unit, as well as improve
the quality of stormwater runoff into the receiving environment
surrounding the developed areas.
Based on the historic rainfall records from the Noosaville and
Tewantin RSL Park rainfall stations, as well as assumed dwelling
sizes and contributing roof areas, it was found that 10,000 L tanks
could, on an annual average basis, supply approximately 96% of
the standard residential household demands for toilet cisterns,
garden irrigation and laundry use. This in turn represents
approximately 25-30% of the total household demand, a significant,
sustained off-set from the bulk water supply system serving the
Noosa area.
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 23.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.