Council archive · source document
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (23.8 MB): may take a few minutes to open.
www.ac ss.gs
+GILBERI
SlJT1-ERI.
CONTENTS
1 Introduction........................................................................7
1 .1 Background..................... ..................................................
7
1 .2 Proposed development .............................7
........................
1.3 Objectives of Integrated Water Cycle Management.......... 7
1.4 Purpose of this report.. ......................................................
8
2 Site description.................................................................. 9
2.1 Property description........ ..................................................
9
2.2 Geology...........................................................................10
2.3 Topography.....................................................................10
2.4 Drainage..........................................................................10
2.5 Vegetation.......................................................................10
2.6 Current land use.............................................................. 11
2.7 Surrounding land use ......................................................
11
3 Approach and methodology.......................................... ..12
3.1 Methodology.................................................................... 12
3.2 Legislative and I nstitutional Context.......... ......................
12
4 Key considerations for developing IWCM Options..........13
4.1 Type and extent of the development.. .............................
13
4.2 Proximity to bulk water and wastewater services............ 13
4.3 Site constraints................................................................ 13
5 IWCM options................................................................. .14
5.1 Option 1...........................................................................14
5.2 Option 2...................... .....................................................
14
5.3 Option 3...................... .....................................................
14
5.4 Option 4...........................................................................14
5.5 Selection of preferred option................ ...........................
15
6 Results -
Analysis of rainwater harvesting option ..........
.16
6.1 Rainfall statistical summary.... .........................................
16
6.2 Rainwater tank assessment............................................ 17
6.3 Precinct approach -
total catchment rainfall capture and
reuse ...............................................................................18
4 AGRICULTURE WATER ENVIRONMENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 23.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.