Council archive · source document
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (23.8 MB): may take a few minutes to open.
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
Table 1.2.1 Indicative site yields
1 Introduction
Estimated
Product
dwellings
Northbrook Corporation Pty Ltd commissioned Northbrook land
Gilbert & Sutherland Pty Ltd (G&S)to prepare an
Premium residential lots 73
Integrated Water Cycle Management Plan
Apartments / Mixed use 50 (est.)
(IWCMP)for the proposed Noosa on Weyba
development (’the development’), Weyba Downs, Retail (600 m2)
Queensland. The site location is shown in Figure Townhouses 83
A 1 in Appendix 1.
Retirement villas/Aged care 120
1.1 Residential lots (Precinct F,G) 164
Background
Total 490
Seven allotments of land make up the site,
however development is proposed only on Lot 2 Hofmann Land
on SP179590, Lot 53 on SP163571 , Lot 11 on Townhouses (Precinct H) 24
RP893393 and Lot 12 on RP893393. The
Residential lots (Precinct H) 52
remaining lots (being Lot 7 on RP46782, Lot 2 on
Residential lots (Precinct I) 203
RP160983 and 1667 on M37772) will be excluded
from the development area as part of a Biodiversity Rural residential lots 1
Development Offset Area (BDOA)agreement. Special residential (Precinct K) 6
The BDOA involves the dedication of these lots (a
Retirement cottages 100
total area of 139.5ha) to the Noosa National Park
Total 386
as high to medium value Koala habitat.
It is understood that the majority of the
Figure A2 in Appendix 1 shows the proposed
investigation area has historically been used for development layout, including the BDOA.
agricultural purposes, specifically livestock
grazing. 1.3 Objectives of Integrated Water
Cycle Management
1.2 Proposed development
The objectives of integrated water cycle
The draft master plan for the Noosa on Weyba
management (IWCM)are primarily:
development proposes the creation of various
To proactively conserve the water resources
rural and residential precincts across the 163ha
of the region through responsible design at
development area. A breakdown of the proposed
the development level; and
residential development across the site is
provided in the Table 1.2.1. To proactively safeguard, and seek to
improve, the water quality in all waterways
The proposed development would include: related to the development.
Subdivision via a Community Title Scheme to
Reference to the ’water cycle’ requires that the
create new lots/land parcels for future
key elements of water demand, wastewater and
development.
stormwater are assessed in an integrated manner
Bulk earthworks where required.
which reduces water demands from the region’s
Construction of internal roads and water resources, meets all wastewater treatment
connections with existing roadways. and effluent discharge specifications, and ensures
that both the quantity and quality of stormwater
Construction of stormwater, water reticulation
runoff do not negatively impact on the receiving
and sewerage infrastructure.
environment.
1 0838_IWCM_RS2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTO _
IWCM 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 23.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.