Skip to the record
The only place to find full transcripts.

Council archive · source document

Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12/0208

Plans and drawings: the text below has words only, no drawings.

Very large file (23.8 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                         www.ac   ss.gs
    +GILBERI
SlJT1-ERI.


1.4   Purpose of this report
The purpose ot the IWCM assessment
documented in this report is to:

    Develop a range ot options tor consideration
    in the management ot the total water cycle;
    and

    To select an IWCM Plan that is practical, cost-
    effective, aligned with all the components ot
    land development and meets the IWCM

    objectives ot the development.




8                                                     AGRICULTURE WATER ENVIRONMENT

Used in these records

About this file

File size
23.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 20 of 37 Appendix 18 - Integrated Water Cycle Management Plan MCU12_0208.pdf · 23.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.