Original source · versioned page text
Reference Document MCU22-0102 Stormwater Management Plan
The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSQIDEP Evaluation SPEL Basin, Sippy Downs
Performance Performance Requirement Monitoring action or result Compliance or
Criteria non
compliance
event collected less than 8
aliquots.
Hydrograph At least 50% of qualifying storms should include the first 70% storm USC reported the hydrographs Compliance
coverage coverage however did not report the
percentage of coverage. Visual
assessment of the hydrographs
which also included the sampling
time demonstrates in excess of
70% coverage for all complying
events. The 22nd November
storm had approximately 60%
coverage however was a non-
compliant storm event (for other
reasons).
Drapper reported that 7 events
did not achieve 80% hydrograph
coverage. These were excluded
to ensure hydrograph coverage
was higher than 80%.
Drapper’s Supplementary Report
reported hydrograph coverage
significantly exceeded the
minimum coverage requirements
of SIDEP v1.3.
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.