Original source · versioned page text
Reference Document MCU22-0102 Stormwater Management Plan
The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSQIDEP Evaluation SPEL Basin, Sippy Downs
Performance Performance Requirement Monitoring action or result Compliance or
Criteria non
compliance
Hydrograph Multiple peaks should be accounted for (at least 1 occurrence). Most hydrographs included in the Compliance.
coverage BOE application show multiple
peaks with sample collection
occurring such that samples were
collected near peaks and on
rising and falling limbs.
Grab sampling Not Applicable Not applicable.
Sampling Sampling occurred upstream of Compliance
locations the SPEL sack and up and
downstream of the SPEL basin.
The subject of this claim is the
performance of the SPEL Basin
measured by comparison of its
upstream location (which is
downstream of the SPEL Sack) to
its downstream location which is
downstream of the Basin outlet.
The claim does not include the
performance of the SPEL Sack.
The claim is independent of the
SPEL Sack but inclusive of the
filter cartridge which filters flows
prior to entry to the Basin.
14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.