Council archive · source document
20517 App M.pdf [As Published] · 132007.1259
Very large file (27.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
SCANLON PROPERTY GROUP _ Ecological A: ent : natural solutions environmental consultants 8.0 RECOMMENDATIONS AND MITIGATION MEASURES The potential impacts associated with the proposed development, and the proposed measures to mitigate these impacts, are identified in Table 6. The level or likelihood of the impact is based on the ecological values identified for the site, proposed activity, and feasibility of prevention and mitigation. A ‘high’ level of impact indicates it is highly likely that this impact will occur and the ability to prevent the impact is minimal. In these instances, containment of the Draft Report impact and / or appropriate and acceptable mitigation measures would be considered. These recommendations are to be considered in conjunction with other environmental management measures, such as_ bushfire management, rehabilitation management, stormwater management, and acid sulfate soils management. In addition to the mitigation measures outlined below, NSEC advises that an EPBC referral should be undertaken for the site, prior to development works. TABLE 6 POTENTIAL IMPACTS ON SITE ECOLOGICAL VALUES AND PROPOSED MITIGATION MEASURES LEVEL OF IMPACT IMPACT PROPOSED MITIGATION MEASURES Loss of Low vegetation . Retention of vegetation within the buffer and remnant wet heath areas, west of the current caravan park area. . Rehabilitation of the existing vegetation buffer between the caravan park area and the remnant wet heath area. * Prepare and implement a Rehabilitation Management Plan to direct the rehabilitation and replanting works to occur within the vegetated buffer area. . The rehabilitation of this area should consider bushfire risks and protection of the remnant heath area from pollutants and stormwater run-off. As such the rehabilitation should occur in accordance with other technical reports for the site = Retention of many of the mature paperbark trees currently existing within the caravan park area. ' Provision of temporary fencing (before and during development works) to protect vegetation to be retained x Fence along the boundary between the caravan park area and the vegetation buffer; and . Fence around mature trees to be retained within the caravan park area. . Minimise the likelihood of erosion and sedimentation through the implementation of an Erosion and Sediment Control Plan. . Avoid dispersal of pollutants / chemicals into retained vegetation areas. . Ensure all vehicles are cleaned (free of contaminants) prior to entering the subject site. = Prepare and implement a stormwater / run-off management plan. . Prepare a Landscaping Plan, which incorporates the use of June 2007 ( 36 ) Y:07\J07-049_215-219 David Low Way, Peregian\Reports\Draft\070620_DR Ecological Assessment_J07-049.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App M.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 27.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.