Council archive · source document
20517 App M.pdf [As Published] · 132007.1259
Very large file (27.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
SCANLON PROPERTY GROUP Ecological Assessment Draft Report za natural solutions environmental consultants IMPACT LEVEL OF IMPACT PROPOSED MITIGATION MEASURES Loss of vegetation (con't) native and endemic plant species. Regular monitoring, and repair if necessary, of temporary fences (erected prior to and during construction phase) bordering retained vegetation and areas of disturbance. Suitable management of soil stripping and vegetation mulching; No dumping of refuse into retained vegetation areas. Ongoing monitoring (and action if necessary) of all rehabilitation areas in accordance with the Rehabilitation Management Plan. Loss of significant fauna / habitat Low Prepare an Environmental Management Plan for the pre-, during, and post-construction phases, which will incorporate detailed fauna management sections Habitat for significant flora and fauna species will be retained and enhanced within vegetated buffer and remnant wet heath areas. Site management plans / strategies to manage for significant species during construction and operation are recommended. Habitat and food resource trees are included in landscaping and rehabilitation areas. Any vegetation clearing on site will be conducted in a sequential manner to allow koalas to move off the site at their own accord. Prior to tree felling activities, a spotter-catcher will be employed to supervise clearing activities. If a koala is spotted (by any person) in a tree on site during vegetation clearing works, the tree containing the koala/s and the surrounding trees must not be cleared on that day. These trees may only be cleared on subsequent days if the koala/s has moved out of them at their own will. Fauna boxes will be erected in suitable trees to help offset the potential necessary removal of hollow-bearing trees during the construction phase. Reduced speed limits (recommended maximum of 10 km) will be implemented on the subject site’s internal road system. Prohibition of domestic pets (e.g., dogs and cats) within the site before, during, and after development works. Water Quality / Stormwater High Prepare a Stormwater Management and Water Quality Plan for the site to appropriately manage the stormwater from the proposed development (before, during, and after construction). Appropriate barriers and fencing (along the boundary between the existing caravan park area and the vegetated buffer) during the construction phase to prevent contaminants entering the wet heath area; Appropriate stormwater infrastructure implemented (in accordance with relevant stormwater plans for the subject site); Appropriate litter control measures across the site to prevent litter and contaminants from the industrial area entering the wet heath areas; Appropriate _sediment__and__erosion control __measures June 2007 (37) Y:\JO7\JO7-049_215-219 David Low Way, Peregian\Reports\Draft\070618_DR Ecological Assessment_J07-049_JW.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App M.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 27.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.