Council archive · source document
20517 App M.pdf [As Published] · 132007.1259
Very large file (27.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
SCANLON PROPERTY GROUP Ecological Assessment Draft Report za natural solutions environmental consultants IMPACT LEVEL OF IMPACT PROPOSED MITIGATION MEASURES Water Quality / Stormwater (con't) implemented during the construction and operational phases; Appropriate chemical storage implemented during construction and operational phases (e.g., chemicals stored in designated bunded areas). Fertilisers and/or herbicides will be limited to frog-friendly varieties. Additional mitigation measures recommended in_ the stormwater management and water quality plan will further minimise this potential impact. Regular monitoring of the water quality of, and quality and quantity of stormwater run-off into, the wet heath and vegetated buffer areas will occur during construction and operational phases. Weed invasion / edge effects High Prepare an Environmental Management Plan for the pre-, during, and post-construction phases, which will incorporate detailed flora management sections, including appropriate pollutant / chemical management. Currently the site supports a number of weed species that have substantial potential as sources for weed invasions into the remnant wet heath and adjacent Noosa National Park. Avoid dispersal of weed species from both internal and external sources by implementing control measures during the construction phase, such as ensuring all vehicles are cleaned (i.e., free of contaminants) prior to entering the subject site. Ensure all removed weeds, weed-affected materials, and rubbish are appropriately disposed of off-site. Weed / vegetation disposal shall be undertaken in accordance with appropriate guidelines outlined by Noosa Shire Council. Weed removal management will be an integral part of the site’s vegetation clearing, landscaping, and rehabilitation works. Only native and endemic plant species, consistent with historical and surrounding RE communities, will be planted in rehabilitation and landscaping works. Retained vegetation shall be monitored to ensure weed levels do not increase above an acceptable level. Pest animals Low The proposed development is not expected to raise the number of pest animals present on the site or within the locality. No disposal of food on-site during construction or operational phases will be permitted. No domestic animals will be allowed on site during construction or operational phases. Noise Moderate Avoid unnecessary noise, as it is a disturbance to fauna. Minimise construction activities to reasonable daylight hours (as per Council By-laws). No night-works will be conducted during the construction phase. Prepare a noise report for the site, which makes recommendations for reducing noise levels during the construction & operational phases. June 2007 ( 38 ) Y:\J07\J07-049_215-219 David Low Way, Peregian\Reports\Draft\070618_DR Ecological Assessment_J07-049_JW.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App M.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 27.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.