SUPERSEDED - Council Meeting Decision - Other Change - MCU18 0102 02 [As Published] · MCU18/0102.02
Damage to Services and Assets
62. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Noise Monitoring
63. Deleted.
64. Noise levels from on-site activities, including guests must not exceed the following levels
at the nearest sensitive receptor:
i. 7am to 6pm = 46 dB(A) LAeq,adj,T;
ii. 6pm to 10pm = 40 dB(A) LAeq,adj,T;
iii. 10.00pm to 7.00am = 35 dB(A) LAeq,adj,T
65. The Food and Drink Outlet approval lapses on 18 January 2025, unless written consent
is provided by Council’s delegate to extend the approval. In assessing a request to
extend the approval, Council will have regard to any substantiated complaints relating
to noise, car parking and any other relevant matters associated with the Food and Drink
Outlet use.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
ADVISORY NOTES:
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
6855.
Co-ordination of Operational Works Assessment
2. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
3. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
and traffic control measures prior to construction
Page 12 of 15
Document Set ID: 22778276
Version: 6, Version Date: 24/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Council Meeting Decision - Other Change - MCU18 0102 02 [As Published].pdfRelated documentApplication case desk ↗
DN - Other Change - MCU18 0102 02 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 210 KB (small file)
- File type
No other editions are linked here.