Council archive · source document
SUPERSEDED - Council Meeting Decision - Other Change - MCU18 0102 02 [As Published] · MCU18/0102.02
ii. maintenance of safe pedestrian access for the areas affected by the works
during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the
development
iv. approval of the Traffic Management Control Plan by the Department of
Transport and Main Roads (DTMR) for any works on State controlled roads
v. provision for worker car parking
b. maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures
c. works programme identifying key components of the works and their respective
durations
d. establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic, services and other relevant issues
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. details on the location of external fill/dump sites, the haulage route, type of vehicle
to be utilised during filling operations and frequency of usage. NB any damage to
the existing road system as a result of haulage operations shall be fully repaired
at the applicant’s expense
g. it is acknowledged that the preliminary Construction Management Plan will be a
draft document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre-Start Meeting for the project.
Private Infrastructure
4. All private infrastructure for the development must be designed to meet the planning
scheme requirements unless otherwise agreed by the relevant authority
Infrastructure Charges
5. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
Page 13 of 15
Document Set ID: 22778276
Version: 6, Version Date: 24/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Council Meeting Decision - Other Change - MCU18 0102 02 [As Published].pdfRelated documentApplication case desk ↗
DN - Other Change - MCU18 0102 02 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 210 KB (small file)
- File type
No other editions are linked here.