Original source · versioned page text
Planning Report 60500
Attached to the e-mail Lot Reconfiguration - Eagle Drive and Tait Street Tewantin REC17/0011.
trees to shade vehicles and to b) otherwise—for every 6 carparking include the construction of off-
reduce reflected radiation; spaces; streetcarparking areas.
c) ensure canopy trees are AND
protected from vehicle damage by S28.2 A minimum area of 5m2 is
providing adequate sized garden provided around each canopy tree,
beds; which is mulched and treated;
d) maximise opportunities for AND
infiltration of rainwater on-site; and S28.3 Plants are grouped in mulched
e) minimise contaminated runoff beds rather than using individual,
entering the stormwater system evenly spaced trees and scrubs;
and watercourse. AND
S28.4 Semi-pervious pavement
surfaces are used, such as grass cell
paving, to increase infiltration of
rainwater and minimise contaminated
runoff, including hydrocarbons, entering
the stormwater system and
watercourses;
AND
S28.5 Runoff from carparking areas is
directed to landscaped areas to
minimise contaminate runoff, including
hydrocarbons, entering the stormwater
system and watercourses;
AND
S28.6 Garden mounding is incorporated
into carparking areas adjacent to
frontages;
AND
S28.7 Surface and subsurface drainage
swales are used to maximize
stormwater infiltration;
AND
S28.8 A planting bed of at least 1m
width with screen fencing and dense
planting is provided to any property
boundary with an adjacent residential
development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.