                                                             Officer:            Andrew Gaffney
                                                             Direct Telephone:   07 53296284
                                                             Our Reference:      132001.210319.1
                                                             Your Reference:     n/a

               29 November 2024


               A Cassidy & SM Cassidy
               C/- Brennan Planning Pty Ltd
               44 Maple St
               COOROY QLD 4563
               [email protected]



               Dear Sir/Madam,
                                             Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 28 June 2024, requesting a minor change to an existing
               development approval. Council on 27 November 2024, decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              132001.210319.1

                   Street address:              39 Douglas St Sunshine Beach Qld 4567

                   Real property description:   Lot 321 RP 48111

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 29 November 2001 (22437 DA)
               •       Development Permit for Material Change of Use of Premises - Three Non-Complying
                       Dwelling Houses
               In relation to the request to make a minor change to the existing approval, Council on 27 November
               2024, decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change.
               B.      Amend condition 18.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                                     PO Box 141
               noosa.qld.gov.au                                                                Tewantin QLD 4565
               [email protected]                                                                07 5329 6500
                                                                                                          Page 1 of 6
Document Set ID: 23378051
Version: 2, Version Date: 29/11/2024
Full text of the other 5 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

                      Environmental Health
               1.     The developer must provide a suitably screen imperviously paved area large enough for all
                      refuse and recycling containers.
                      Building
               2.     An identification survey of the subject site is to be carried out by a Licensed Surveyor and is
                      to be submitted to Council at the time of foundation inspection or immediately thereafter.
                      Such survey shall set out the boundaries of the site and the position of the buildings on the
                      site.
               3.     A verification survey of the building is to be carried out by a Licensed Surveyor and a
                      certificate lodged with Council at completion of the work confirming compliance with the
                      maximum building height above natural surface, required by the provisions of the Planning
                      Scheme.
                      Land Development
               4.     A 3.5m wide vehicular access from the Douglas Street frontage of the site is to be constructed
                      to Council’s design standards. A Development Permit for Operational Works shall be
                      obtained prior to the commencement of any works.
               5.     All redundant vehicular crossings to the site shall be removed and replaced by kerb and
                      channel and footpath paving in accordance with Council’s Standard specifications prior to
                      commencement of the use permitted by this permit.
               6.     All services in footpath area adjacent to the development shall be located prior to designs
                      being completed, and their location being reflected on the design.
               7.     Investigations shall be carried out on the size of the exposed rock near location of access to
                      lot 319. Should the size be excessive than the access may need to be relocated. Details of
                      which shall be provided with operational works application.
                      Car Parking
               8.     Carparking shall be provided within the site as shown on plan DS1 undated as submitted by
                      Will Franklin except as modified herein for at least 6 spaces including a minimum of 6 covered
                      spaces. The carparking area shall be designed to comply with the provisions of AS 2890.1-
                      1993 for user class 1. The double spaces are to be in tandem formation, minimum width of
                      enclosed garages shall be 3.0 metres.
               9.     The carparking area shall be drained and the sealed pavement constructed to access road
                      standards. Plans and specifications for these works shall be submitted in conjunction with
                      an application for a Development Permit for Operational Works.
                      Frontage Works
               10.    A new 1.2 metre wide concrete footpath to Council’s design standards shall be constructed
                      across the Douglas Street frontage of the site and connect to existing footpath in Bryan
                      Street.
                      A Development Permit for Operational Works shall be obtained prior to the commencement
                      of any works. Footpath and property alignment levels maybe obtained from the Works
                      Inspector-Development upon request. The footpath is to be constructed taking care to
                      protect any significant vegetation and underground services.
                      Stormwater Disposal
               11.    Roof and surface water is to be collected on site and is to be discharged through a single
                      underground drain line for each property into existing drainage in Douglas Street.
               12.    The maximum discharge of stormwater drainage allowable to Council's street gutter at any
                      one location is 25 litres/second.



                                                                                                        Page 2 of 6
Document Set ID: 23378051
Version: 2, Version Date: 29/11/2024

Page 3

                      Erosion and Sediment Control
               13.    To protect the environment against siltation/sediment export or soil erosion as a result of this
                      development, an erosion and sediment control plan shall be submitted in conjunction with
                      any Development Permit for Building Works. Site control measures such as silt fencing,
                      controlled gravel access to the site and controlled disposal of waste, may be necessary. Prior
                      to commencement of building works, all physical site control measures shall be installed, and
                      the plan adhered to.
                      Prior to commencement of building works a $1500 site control bond is required to be lodged
                      with Council to ensure compliance with this condition.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      this condition or any additional inspections incurred for substandard work or works
                      undertaken not in accordance with this permit.
                      Services
               14.    Each property shall be connected to Council’s Water Supply and Sewerage reticulation
                      systems to the Water and Sewerage design guidelines.
               15.    Each water connection to the water reticulation system shall extend to the property boundary
                      and be metered. All fees for the supply of water meters shall be paid to the Council.
               16.    Detailed design drawings and calculations shall be submitted with an application for a
                      Development Permit for Operation Works in respect of water or sewer works. To avoid
                      conflict with other underground pipes or services, all existing and proposed services required
                      by the development shall be shown on the plans.
               17.    All connections to sewer system shall be carried out either by Council or by a Council
                      approved Contractor and at no cost to Council. Any connection to a water main shall be
                      undertaken by Council.
                      General
               15.    Prior to undertaking any excavation, the person acting on this permit shall contact public
                      utility service providers to ascertain the location of their underground services.
                      Land Use
               18.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are numbered DSH.319.03,
                      DSH.319.05, DSH.320.03, DSH.320.05, DSH.320.06, DSH.GEN.02, DSH.GEN.03 prepared
                      by Will Franklin and dated 8.7.02 and DD.01, DD.02, DD.03, DD.04, DD.05, DD.06, DD.07,
                      DD.08, DD.09, DD.10, DD.11, DD.12 and DD.13 prepared by Georgina Price Design, as may
                      be amended by these conditions.
               19.    The development must be undertaken and operated in a manner that causes no detrimental
                      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
                      lighting nuisance or other emissions.
               20.    Deleted.
               21.    Existing trees on the site and within road reserves are to be retained, except where required
                      to be removed due to building operations or the conduct of the approved use.
               22.    A minimum of 4 x 75 Litre street trees are to be located within the Douglas Street road
                      reserve. The remainder of the trees indicated on the landscaping plan are to planted at a
                      minimum of 45 Litres, with shrubs planted at a minimum pot size of 300mm and groundcover
                      planted at a minimum of 200mm.
               23.    Security in the form of a cash bond or trading bank guarantee to the sum of $3000 must be
                      submitted, to secure performance of all conditions of this approval, prior to the issue of a
                      Development Permit for building works. The cash bond or trading bank guarantee will be
                      returned on performance of the conditions of approval less any costs incurred by Council in
                      respect of enforcing performance of this permit.


                                                                                                        Page 3 of 6
Document Set ID: 23378051
Version: 2, Version Date: 29/11/2024

Page 4

               24.    The requirements of this development approval are to be effected, prior to the use of the
                      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
                      this approval to effect compliance with conditions.
               25.    This Development Permit for a material change of use of premises lapses if:-
                      25.1 the use or erection of a building or other structure associated with the use, has not
                           been commenced by 29 November 2005, unless application is made and approved by
                           Council for an extension; or
                      25.2 the use of any premises pursuant to the Development Permit ceases.
               26.    The developer must obtain all of the other Development Permits referred to in the Decision
                      Notice, prior to obtaining a Development Permit for building works.
               5.     REFERRAL AGENCIES

               Not applicable
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               1.     The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
                      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
                      building site in a way that makes or causes audible noise to be made from the building work:-
                      1.1     On a Sunday or public holiday, at any time; or
                      1.2     On a Saturday or a business day, before 7.00am or after 6.30pm.
                      A maximum penalty of $1,500 applies to an offence under this legislation.
               2.     In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
                      paint, cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed
                      where it could reasonably be expected to move into a roadside gutter, stormwater drain or a
                      water course. On the spot fines apply for such offences.
               3.     We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their
                      responsibilities under the Disabled Discrimination Act (DDA) in regard to the installation of
                      disabled access and the provision of disabled facilities, and that access to this building and
                      the provision of sanitary facilities may need to comply with the requirements of Section D
                      Part D3 and Section F Clause F2.4 of the Building Code of Australia.
                      Infrastructure Charges
               4.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
               7.     PROPERTY NOTES

               Not applicable
               8.     VARIATION APPROVAL DETAILS

               Not applicable
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required               Subject of the required Development Permit

                Development Permit for Building Works             All Building work.



                                                                                                        Page 4 of 6
Document Set ID: 23378051
Version: 2, Version Date: 29/11/2024

Page 5

               10.      SUBMISSIONS

               Not applicable
               11.      RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               12.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.
               Yours faithfully,




               Andrew Gaffney
               Senior Development Planner


               Enc:     Appeal Rights
                        Approved Plans/Documents



               DECISION NOTICE HISTORY
               •     Original Decision Notice 29 November 2001.
               •     Minor Change to the approval with amendment to Conditions 18
                     and 25 and the deletion of Condition 20.
               •     Decision Notice – 27 November 2024 – Minor change to the
                     approval with amendment to condition 18




                                                                                                       Page 5 of 6
Document Set ID: 23378051
Version: 2, Version Date: 29/11/2024

Page 6

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 6 of 6
Document Set ID: 23378051
Version: 2, Version Date: 29/11/2024

Used in these records

About this file

File size
171 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 132001 210319 1.pdf · 171 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.