Council archive · source document
Minor Change Existing Approval 132001 210319 1 · 132001.210319.1
4. ASSESSMENT MANAGER CONDITIONS
Environmental Health
1. The developer must provide a suitably screen imperviously paved area large enough for all
refuse and recycling containers.
Building
2. An identification survey of the subject site is to be carried out by a Licensed Surveyor and is
to be submitted to Council at the time of foundation inspection or immediately thereafter.
Such survey shall set out the boundaries of the site and the position of the buildings on the
site.
3. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height above natural surface, required by the provisions of the Planning
Scheme.
Land Development
4. A 3.5m wide vehicular access from the Douglas Street frontage of the site is to be constructed
to Council’s design standards. A Development Permit for Operational Works shall be
obtained prior to the commencement of any works.
5. All redundant vehicular crossings to the site shall be removed and replaced by kerb and
channel and footpath paving in accordance with Council’s Standard specifications prior to
commencement of the use permitted by this permit.
6. All services in footpath area adjacent to the development shall be located prior to designs
being completed, and their location being reflected on the design.
7. Investigations shall be carried out on the size of the exposed rock near location of access to
lot 319. Should the size be excessive than the access may need to be relocated. Details of
which shall be provided with operational works application.
Car Parking
8. Carparking shall be provided within the site as shown on plan DS1 undated as submitted by
Will Franklin except as modified herein for at least 6 spaces including a minimum of 6 covered
spaces. The carparking area shall be designed to comply with the provisions of AS 2890.1-
1993 for user class 1. The double spaces are to be in tandem formation, minimum width of
enclosed garages shall be 3.0 metres.
9. The carparking area shall be drained and the sealed pavement constructed to access road
standards. Plans and specifications for these works shall be submitted in conjunction with
an application for a Development Permit for Operational Works.
Frontage Works
10. A new 1.2 metre wide concrete footpath to Council’s design standards shall be constructed
across the Douglas Street frontage of the site and connect to existing footpath in Bryan
Street.
A Development Permit for Operational Works shall be obtained prior to the commencement
of any works. Footpath and property alignment levels maybe obtained from the Works
Inspector-Development upon request. The footpath is to be constructed taking care to
protect any significant vegetation and underground services.
Stormwater Disposal
11. Roof and surface water is to be collected on site and is to be discharged through a single
underground drain line for each property into existing drainage in Douglas Street.
12. The maximum discharge of stormwater drainage allowable to Council's street gutter at any
one location is 25 litres/second.
Page 2 of 6
Document Set ID: 23378051
Version: 2, Version Date: 29/11/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132001 210319 1Related documentApplication case desk ↗
About this file
- File size
- 171 KB (small file)
- File type
No other editions are linked here.