Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Minor Change Existing Approval 132001 210319 1 · 132001.210319.1

of 6

Text shows just the words. Original shows the document exactly as it was published.

                      Erosion and Sediment Control
               13.    To protect the environment against siltation/sediment export or soil erosion as a result of this
                      development, an erosion and sediment control plan shall be submitted in conjunction with
                      any Development Permit for Building Works. Site control measures such as silt fencing,
                      controlled gravel access to the site and controlled disposal of waste, may be necessary. Prior
                      to commencement of building works, all physical site control measures shall be installed, and
                      the plan adhered to.
                      Prior to commencement of building works a $1500 site control bond is required to be lodged
                      with Council to ensure compliance with this condition.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      this condition or any additional inspections incurred for substandard work or works
                      undertaken not in accordance with this permit.
                      Services
               14.    Each property shall be connected to Council’s Water Supply and Sewerage reticulation
                      systems to the Water and Sewerage design guidelines.
               15.    Each water connection to the water reticulation system shall extend to the property boundary
                      and be metered. All fees for the supply of water meters shall be paid to the Council.
               16.    Detailed design drawings and calculations shall be submitted with an application for a
                      Development Permit for Operation Works in respect of water or sewer works. To avoid
                      conflict with other underground pipes or services, all existing and proposed services required
                      by the development shall be shown on the plans.
               17.    All connections to sewer system shall be carried out either by Council or by a Council
                      approved Contractor and at no cost to Council. Any connection to a water main shall be
                      undertaken by Council.
                      General
               15.    Prior to undertaking any excavation, the person acting on this permit shall contact public
                      utility service providers to ascertain the location of their underground services.
                      Land Use
               18.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are numbered DSH.319.03,
                      DSH.319.05, DSH.320.03, DSH.320.05, DSH.320.06, DSH.GEN.02, DSH.GEN.03 prepared
                      by Will Franklin and dated 8.7.02 and DD.01, DD.02, DD.03, DD.04, DD.05, DD.06, DD.07,
                      DD.08, DD.09, DD.10, DD.11, DD.12 and DD.13 prepared by Georgina Price Design, as may
                      be amended by these conditions.
               19.    The development must be undertaken and operated in a manner that causes no detrimental
                      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
                      lighting nuisance or other emissions.
               20.    Deleted.
               21.    Existing trees on the site and within road reserves are to be retained, except where required
                      to be removed due to building operations or the conduct of the approved use.
               22.    A minimum of 4 x 75 Litre street trees are to be located within the Douglas Street road
                      reserve. The remainder of the trees indicated on the landscaping plan are to planted at a
                      minimum of 45 Litres, with shrubs planted at a minimum pot size of 300mm and groundcover
                      planted at a minimum of 200mm.
               23.    Security in the form of a cash bond or trading bank guarantee to the sum of $3000 must be
                      submitted, to secure performance of all conditions of this approval, prior to the issue of a
                      Development Permit for building works. The cash bond or trading bank guarantee will be
                      returned on performance of the conditions of approval less any costs incurred by Council in
                      respect of enforcing performance of this permit.


                                                                                                        Page 3 of 6
Document Set ID: 23378051
Version: 2, Version Date: 29/11/2024

Used in these records

About this file

File size
171 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 132001 210319 1.pdf · 171 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.