GENERAL COMMITTEE MEETING AGENDA                                                       13 MAY 2019


culvert and for road widening to extend slightly north of this area. The following image details the
extent of road widening works in Kauri Street north of the subject site (the plan is also included in
Attachment 1).




                         Figure 1: New roadworks proposed in Kauri Street
The amended drawings have been reviewed and are considered to provide a satisfactory and
safe outcome and it is not reasonable for the applicant to provide kerb and channelling for the full
extent of the adjoining property. It is recommended that condition 21 be amended to read:
21.   The full length of the Kauri Street and Olivine Street frontages of the development site must
      be upgraded by providing kerb & channel, bitumen road widening, stormwater structures
      and landscaping improvements to the footpath in accordance with an Operational Works
      approval. The works must include but are not limited to the following:
      21.1. In regard to the Kauri Street frontage, the new kerb and channel must be
            aligned so that it is offset 8 metres from the existing kerb and channel on the
            western side of Kauri Street measured from the nominal face of the kerb. The
            new works must be extended to the north of the subject site and be generally in
            accordance with drawing number 2018068 – Dwg 04 of 24 titled External Works
            Layout Plan dated March 2019 prepared by 360 Civil Consulting and join
            smoothly with the existing formation
Condition 29
29.   A CCTV inspection must be carried out by a Council approved CCTV contractor upon
      satisfactory completion of construction works. The developer will be responsible for the full
      cost of CCTV inspection, including any additional inspection necessary following defect
      identification and rectification.


                                                                                       Page 6 of 32
Log in to download the original file

2019-05-13 General Committee Meeting Agenda(PDF, 4MB).pdf · 3.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.