3.6.1 Grease Trap/s
The installation of a suitably sized grease trap/s should be considered given the nature of the wastewater
associated with the likely kitchen waste / blackwater to be generated by the development. The grease
trap should then be adopted as part of the operation and maintenance of the facility and require regular
inspection, service and maintenance.
3.6.2 Peak Flows and Low Flows
The selected wastewater treatment plant must be able to cope with periods of sustained high or peak
loads and also periods of very low influent. During these times, appropriate flow balancing may be
necessary in order to buffer against such extreme variable conditions.
3.6.3 Pump Station/s
Due to the site topography and positioning of the proposed development (as per Appendix A), one or
more pump stations will be required to distribute raw effluent to the proposed sewerage treatment plant
(estimated to be positioned in the southern portion of Lot 650 M37380 (subject to change)).
3.6.4 Alarms and Early Warning Systems
The installation of early warning systems into the proposed development sewerage infrastructure is vital.
It is recommended that a high level and failure alarms with battery backup are considered as part of the
overall design.
3.6.5 Service and Maintenance
The service and maintenance provider must attend and complete the required service and maintenance
of the sewerage treatment plant on a minimum 3 monthly basis.
20 April 2022 Land Suitability Report 8
CYC Campsite
48 Kabi Road, Cootharaba
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.