Original source · versioned page text
Att11 - Land Suitability (effluent) Report
Very large file (13.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.
FPE Ref: 6195-220404-1.0
Feature Recommended Separation Distance
In ground potable water tank 6m from the boundary of the land application area
Top bank of a permanent watercourse; Top 10m for advanced secondary
bank of intermittent watercourse; Top bank
of a lake; Top water level of a surface water
source used for agriculture, aquaculture or
stock purposes; Easement boundary of
unlined open stormwater drainage channel
or drain
Bore or a dam used or likely to be used for 10m for advanced secondary
human and or domestic consumption
Unsaturated soil depth to a permanent 0.3m (vertical) for advanced secondary
water table
Note: Surface spray irrigation system must be located at least 10m from any habitable area
STORMWATER DRAINAGE
Issues relating to surface flows may become prevalent within the disposal areas during extended periods
of rainfall. Accordingly, it is recommended that a cut-off drain or diversion drain/mound is constructed
upslope of the disposal areas to collect and divert any surface/subsurface waters away from the disposal
area.
All stormwater runoff from the roof of buildings and/or pavement areas associated with the development
on the site should not be discharged in a concentrated form onto the disposal areas or neighbouring
properties.
20 April 2022 Land Suitability Report 11
CYC Campsite
48 Kabi Road, Cootharaba
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.