Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2016-07-12 - Item 14 - Att 1 - Effluent Disposal Planning Study

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

In Cooroy, where there is sewerage available, the minimum allotment size can be 800 m².
Pomona and Cooran have a minimum allotment size of 2000 m² which can be reduced to 1000 m²
if a connection to sewerage reticulation is available. That reduction will only apply to Pomona as
Cooran will remain unsewered due to Unitywater having no plans to install it. Boreen Point and Kin
Kin have a minimum allotment size of 2000 m². The small settlement of Cooroibah is set at 1000
m². Cooroibah is sewered and in any event has no further potential for subdivision.

With Cooran having no prospects of sewerage being installed, the future minimum allotment size in
the next planning scheme could be specified at 2000 m².




On-Site Effluent Disposal in Noosa Shire 2016                                             Page 16
Log in to download the original file

2016-07-12 - Item 14 - Att 1 - Effluent Disposal Planning Study(PDF, 1MB).pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.