Original source · versioned page text
Town Planning Report - 22 November 2018 - Final
Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.
“Adamson Town Planning, specialising in providing higher order town planning advice” Water Quality: In terms of environmental values and the quality of Queensland waters, the reconfiguring a lot is for an urban purpose that involves premises 2500m² or greater in size and will result in six or more lots. The ultimate design of the development will provide stormwater treatment during construction and for the treatment of sealed areas once developed, this being subject to further development applications and approvals. Natural Hazards, Risk and Resilience: The subject land is identified as being subject to bushfire. As discussed above, the site is ultimately to be cleared to allow for development. The removal of the vegetation eliminates the potential risk from bushfire other than for development within Precinct E7, which adjoins public open space areas and to a lesser extent Precincts E2 and E6. The matter of bushfire management will be required to be addressed with the subsequent applications addressing the necessary building setbacks and other infrastructure required to minimise the risk to people and property. Energy and Water Supply: The subject land contains an electricity supply easement along the eastern boundary which contains major overhead electricity supply infrastructure. It is not expected that the proposed development would have any adverse impact upon the existing electricity supply infrastructure, with the application being referred to Energex in any event (refer Figure 7). Transport Infrastructure: In terms of the active transport corridor the transport infrastructure and existing and future transport corridors are reflected and will be supported through compatible land uses. The proposed development is consistent with proposed transport infrastructure intended for the SBC (refer Figure 7). Infrastructure Charges Ordinarily, infrastructure charges would be payable under the Noosa Shire Council Charges Resolution (No.3) 2018, for the proposed development; however, under part 10.3 of the Infrastructure Agreement, no other infrastructure charges are payable with exception for water supply and sewerage infrastructure. This is provided the proposed development does not exceed the intensity of development envisaged under Master Plan 2, which forms Annexure 5 of the Infrastructure Agreement (Attachment 2). The proposed reconfiguring a lot is consistent with the SBC Map and the former Master Plan 2. It is noted that under part 10.4. of the Infrastructure Agreement, the applicant is required to pay infrastructure charges for water supply and sewerage, this being equivalent to water supply and sewerage headworks under former contributions policy. At the time of providing the sewerage pump station for the first stage, Council provided a letter dated 23 May 2007, giving a credit for sewerage infrastructure charges for future stages of the SBC based on the overall percentage of loading attributable to the adjoining site owned by Tetrex the time (refer Attachment 3). On this basis an amount of up to $59,548 would be allowed as at May 2007. While this is now a matter for Unitywater, it is hoped that this credit will be taken into consideration for any infrastructure charges payable for water supply and sewerage. 18028 – Stockwell Development Group Pty Ltd Page 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original