Original source · versioned page text
SUPERSEDED Decision Notice - Approved by Delegation of Authority MCU20/0021 [As Published]
Currency Period
63. The Currency Period for this development approval lapses if the use has not happened by
29 October 2026, unless an application to extend the currency period is approved by
Council.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
PLANNING
Resubmission of Amended Plans Required
1. The conditions of this Decision Notice require resubmission of plans to Council with
amendments. Please address the amended plans to Council’s Development Assessment
Branch with the Reference No. MCU20/0021, separate to any Operational Works
application. To avoid delays and assessment issues with the Operational Works
application, it is recommended the plans be resubmitted prior to lodgement of any
Operational Works application. However, should the plans not be submitted, the applicant
is advised that a Preliminary Approval may be issued in lieu of a Development Permit.
Infrastructure Charges
2. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue.
Development Compliance Inspection
3. Prior to the commencement of the use, please contact Council's Development Assessment
Branch to arrange a Development Compliance Inspection.
Sustainability
4. In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable
building design for residential and commercial development. Council encourages the use of
sustainable building materials, energy efficient fittings, solar hot water, photovoltaic
systems (including the use of inverter/charges), water saving devices and rainwater
harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes
ENGINEERING
Building and Construction Industry (Portable Long Service Leave) Levy
5. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details that
the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
6. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
7. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
Page 9 of 12
Document Set ID: 21280390
Version: 4, Version Date: 30/10/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.