SUPERSEDED Decision Notice - Approved by Delegation of Authority MCU20/0021 [As Published]
Services
53. Unless otherwise stipulated by telecommunications legislation at the time of construction,
the development must be provided with all necessary conduits, pits and pipes to
accommodate the future connection of optic fibre technology telecommunications.
54. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
55. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
56. All easements must be designed in accordance with the planning scheme and granted at
no cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
57. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
58. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, and contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council.
59. The Filling works required on site shall be carried out in accordance with Council’s
Planning Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the
additional ponding of water on any adjoining lands or the blockage of, or interference with,
any natural watercourses.
60. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Damage to Services and Assets
61. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
RECONFIGURING A LOT
Reconfiguring a Lot (Access Easements)
Access Easements
62. Reciprocal easements for Access must be created prior to the commencement of the use.
The extent of the easements must be generally be as shown on the approved plans and be
of sufficient dimensions to wholly contain the access and manoeuvring areas required to
permit vehicles to enter the site in a forward gear, access the garaging and exit the site in a
forward gear. The easements must also include services where necessary. Prior to Council
endorsement of the Plan of Survey, a duly executed copy of any required easement
document must be submitted to Council for perusal.
Page 8 of 12
Document Set ID: 21280390
Version: 4, Version Date: 30/10/2020