PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MAY 2019
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Plumbing and Building Audit, Audit Programme stage one of four Mail out stage two commercial Undertake a desk top analysis with
Educational Programmes stages (Backflow Prevention Device) properties subject to Backflow identified results of audits (estimated
and Swimming Pool Immersions Stage one completed and stage two Prevention Device audit programme programme timeframe = 9 months)
to commence in March 2019. Current investigations into reported This programme is 100% complete
Swimming Pool educational Queensland Health pool immersion to date. Results are as follows;
programme – Council developed (possible fatalities) 1. 100 devices added to register.
educational brochures mailed out to o 86 Noosa Pde, Noosa Heads 2. 66 commercial properties are
4,000 pool owners within the Shire. o 6 Cooloosa Street, Sunshine protected from cross
Continue to investigate swimming Beach connections
pool immersions as requested by o 29 Viewland Drive, Noosa Identify appropriate swimming pool
Queensland Health. Heads safety signage for customers
Compliance Approvals –Council and Continuing audit of outstanding Continue to undertake desk top Continue to work with internal
Community. Building files. 50% of internal study and inspect outstanding Council, community groups and
identified building files completed to Internal and external building files external customers in completing
date and 3% of external identified Plumbing projects; outstanding building and plumbing
building files completed to date 1. North Shore Wilderness Camp, approvals.
Undertake plumbing design and Design and Plumbing approval
approval of internal Council projects for Alternative solution
(plumbing and waste water)
2. Noosa Tip – Building and
Plumbing approvals
3. Building & Plumbing approval
for demolition of Jet ski shed
Hastings Street
4. Soccer club Girraween Sports
complex – Roof to Grandstand
5. Demo shade house Botanical
Gardens
6. Pony Club Tewantin Amenities
approval
7. Cooran Crusher Park- seating
roof structure
State Government Form 4A Process Meet with all Public entities including Meet with Unitywater to discuss Continue to undertake Shire wide
Implementation Audit Programme. Noosa Council and Q Build procedure options for form four audits
(included in programme: Federal, State Queensland representatives to submissions to Council Continue to meet with Unitywater, Q
and Local Government Agencies) discuss processes for audits Build and Main Roads
representatives to discuss the
ongoing development of this
programme.
Page 62 of 63
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.