Engineering RFI Response

of 2

Page text shows just the words. Original shows the document exactly as it was published.

   Information Required
    10. Please provide a preliminary earthworks plan that indicates the volume of fill required for the site
        and where necessary (if fill volume triggers the requirement against the Acid Sulfate Soil Overlay
        Code), provide an Acid Sulfate Soil Management Plan prepared by an RPEQ that provides
        recommendations to address the potential risks associated with the fill works.

   Issue – Footpath Width
   The submitted plan only indicates a small portion of the footpath being replaced at the existing width.
   The current Noosa Planning Scheme and Councils standard drawings require footpaths along
   Distributor roads to be at a width of 3.0m desirable or 2.0m minimum.
   Information Required
    11. With existing features restricting the width of the verge area available for a 3.0m wide footpath,
        please amend the engineering plan/s to include a 2.0m wide footpath across the frontage of the
        development.


Response
Responses to the above matters are as follows:
8. Refer to the updated vehicle turnpaths included on the updated engineering drawings that
    accompany this response.
9. The property to the south at 8 Pipi Crescent, Noosaville currently achieves a lawful point of discharge
    through kerb adaptor to Pipi Crescent which is clearly visible via Google Street View. The whole site
    should have been profiled to fall towards the frontage at the subdivision phase though as detailed
    survey information is not available it is agreed that small volumes of nuisance runoff may reach the
    development site. As a result all fill walls are proposed to be offset 150mm off the property
    boundaries to allow this small volume of runoff to pass along the base of the wall within the
    development site out to Weyba Rd.
10. The fill volume has now been included on the updated engineering drawings that accompany this
    response. As the calculated volume is below 500m3 it does not trigger an acid sulphate soils
    investigation.
11. The requested 2.0m wide footpath has been added to the updated engineering drawings that
    accompany this response.

Should you require further information in this regard, please do not hesitate to contact me at the Sunshine
Coast office.

Yours faithfully,




Jared Hill CPEng | RPEQ 19891
Associate | Senior Civil Engineer
Westera Partners Pty Ltd




                                                                                                          2
Log in to download the original file

Engineering RFI Response.pdf · 279 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.