5. GEOTECHNICALASSESSMENT

5.1     Earthworks


All site preparation work should generally be carried out in accordance with AS3798-2007 ’Guidelines on
Earthworks for Commercial and Residential Developments’.


The site should be stripped of any topsoil from the cut and fill areas and road alignments/carparking areas,
and  stockpiled for later use, if required. A stripping depth in the order of 0.1 m       is indicated from the
information gathered at the investigation locations.


Prior to the placement of any structural fill, the site should be proof rolled using a minimum 10 tonne dynamic

padfoot roller. Any loose/soft areas should be removed and recompacted or replaced using a compacted
select fill.


Depressions formed by the removal of vegetation, existing structures, underground services etc, should have
all disturbed soil cleaned out and be backfilled with compacted select fill material.


Excavatability

No problems should be encountered in excavating the near surface material on site. Most soils encountered
on   site should be within the excavation limits of a small dozer (eg Cat D6 or similar) in bulk excavations or
medium size backhoe (eg Case 580 or similar) in trench excavations.


While there is no direct reliable relationship between drilling resistance and excavatability, as a rule of thumb
the limit of the ’TC’ bit may be taken as indicative of the limit of excavation of a medium sized dozer in bulk
excavation (Cat D7E, D8) or a large excavator in trench excavation (Kato or Hymac).


Generally below the ’TC’ bit limit, larger excavation equipment, compressor driven pneumatic tools, or
hydraulic rock breakers would be required for excavation.

If, during bored pier or other operations, suspected weaker material is encountered below the limit of the
investigation work, Cardno Bowler should be contacted immediately to assess the nature of this strata.

Material won from any excavation of the site would generally comprise of a mixture of clays and clayey and

silty sands which are considered to be a poor quality fill materials due to their high percentage of fines and in
the case of the silty sands, the difficulty in achieving adequate compaction as soils tends to heave whilst

being worked.

Structural Fill


To minimise the      potential for post compaction volume change due to moisture content variations, any
structural clay   bearing fill should be placed in loose layers not greater than 200mm thick at a moisture
content in the range -2% to +3% of the standard optimum moisture content, and be compacted to a minimum

dry density ratio of 95% standard compaction as per AS1289 5.1.1 for areas where it is proposed to have
residential type structures. In areas that it is proposed to have commercial structures clay bearing fill should
be compacted to a minimum dry density ratio of 98% standard compaction. Clay bearing fill should be

compacted using a minimum 10 tonne vibrating padfoot roller.

Measures should be adopted to ensure that this clay bearing fill material is not allowed to dry out prior to the

placement of succeeding layers of fill and final covering with building slabs and road pavements.

Any structural free draining sand fill should be placed in loose layers not greater than 200mm thick, flooded,
if necessary, and compacted to a minimum density index of 70% as per AS1289 5.5.1 for areas where it is

proposed to have residential type structures. In areas that it is proposed to have commercial structures, any

Prepared for Cardno (Old)                                                                                 Page 13

Used in these records

About this file

File size
49.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 6 of 37 Appendix 3 - Geotechnical Assessment MCU12_0208.pdf · 49.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.