Council archive · source document
Part 6 of 37 Appendix 3 - Geotechnical Assessment MCU12/0208
Very large file (49.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Noosa on Weyba 5. GEOTECHNICALASSESSMENT 5.1 Earthworks All site preparation work should generally be carried out in accordance with AS3798-2007 ’Guidelines on Earthworks for Commercial and Residential Developments’. The site should be stripped of any topsoil from the cut and fill areas and road alignments/carparking areas, and stockpiled for later use, if required. A stripping depth in the order of 0.1 m is indicated from the information gathered at the investigation locations. Prior to the placement of any structural fill, the site should be proof rolled using a minimum 10 tonne dynamic padfoot roller. Any loose/soft areas should be removed and recompacted or replaced using a compacted select fill. Depressions formed by the removal of vegetation, existing structures, underground services etc, should have all disturbed soil cleaned out and be backfilled with compacted select fill material. Excavatability No problems should be encountered in excavating the near surface material on site. Most soils encountered on site should be within the excavation limits of a small dozer (eg Cat D6 or similar) in bulk excavations or medium size backhoe (eg Case 580 or similar) in trench excavations. While there is no direct reliable relationship between drilling resistance and excavatability, as a rule of thumb the limit of the ’TC’ bit may be taken as indicative of the limit of excavation of a medium sized dozer in bulk excavation (Cat D7E, D8) or a large excavator in trench excavation (Kato or Hymac). Generally below the ’TC’ bit limit, larger excavation equipment, compressor driven pneumatic tools, or hydraulic rock breakers would be required for excavation. If, during bored pier or other operations, suspected weaker material is encountered below the limit of the investigation work, Cardno Bowler should be contacted immediately to assess the nature of this strata. Material won from any excavation of the site would generally comprise of a mixture of clays and clayey and silty sands which are considered to be a poor quality fill materials due to their high percentage of fines and in the case of the silty sands, the difficulty in achieving adequate compaction as soils tends to heave whilst being worked. Structural Fill To minimise the potential for post compaction volume change due to moisture content variations, any structural clay bearing fill should be placed in loose layers not greater than 200mm thick at a moisture content in the range -2% to +3% of the standard optimum moisture content, and be compacted to a minimum dry density ratio of 95% standard compaction as per AS1289 5.1.1 for areas where it is proposed to have residential type structures. In areas that it is proposed to have commercial structures clay bearing fill should be compacted to a minimum dry density ratio of 98% standard compaction. Clay bearing fill should be compacted using a minimum 10 tonne vibrating padfoot roller. Measures should be adopted to ensure that this clay bearing fill material is not allowed to dry out prior to the placement of succeeding layers of fill and final covering with building slabs and road pavements. Any structural free draining sand fill should be placed in loose layers not greater than 200mm thick, flooded, if necessary, and compacted to a minimum density index of 70% as per AS1289 5.5.1 for areas where it is proposed to have residential type structures. In areas that it is proposed to have commercial structures, any Prepared for Cardno (Old) Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 6 of 37 Appendix 3 - Geotechnical Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 49.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.