Noosa on Weyba
6.2 SCR Analysis
The more definitive full SCR (chromium reducible) suite of laboratory tests were carried out on samples
recovered at 0.5m intervals from boreholes BH4, BH15, BH24, BH25, BH26, BH30, BH31, BH32. A total of
16 tests were used to determine levels of acidity.
Full laboratory test results are included in Annex B. Table 3 below provides a summary of determined net
acidity values for each tested sample. The net acidity has been based on the following equation from the
Acid Sulfate Soils Laboratory Methods Guidelines, Version 2.1, June 2004:
Net Acidity = Potential Sulfidic Acidity
*
plus Actual Acidity
*
plus Retained Acidity
*
minus Acid Neutralising Capacity/Fineness Factor
*
(not all components are included -
depends on pHKC1 results).
Table 8 Calculated Net Acidity Results
Test Depth Net Acidity,
Location
(m) (eq%S)
0.00-0.50 0.038
BH4
1.00-1.50 0.208
0.00-0.50 0.017
BH15
1.00-1.50 0.027
0.00-0.50 0.005
BH24
1.00-1.50 0.034
BH25 0.00-0.50 0.024
1.00-1.50 0.026
BH26 0.00-0.50 0.038
1.00-1.50 0.071
BH30 0.00-0.50 0.055
1.00-1.50 0.200
BH31 0.00-0.50 0.047
100-1.50 0.193
BH32 0.00-0.50 0.055
1.00-1.50 0.051
The relevant Tables A3.1 to A3.4 describing the particular analyses used in this calculation are reproduced
in Annex C.
The levels of potential sulfidic acidity (SCR or Spos) ranged between 0.005% and 0.208%, with the more
significant levels generally being encountered at depths of 1.0m to 1.5m at boreholes BH4, BH30, BH31.
The levels of actual acidity (s-TAA) ranged between 0.003% and 0.208%, with the more significant levels
generally being encountered at depths of 1.0m to 1.5m at locations BH4, BH30, BH31.
For projects that will disturb more than 1000 tonnes of soils the net acidity action criteria limit is 0.03% in
sulfur units, or 18mol H+/tonne for acidity units. Detailed design information on the proposed excavations on
site (eg for services and the basement, etc) are not available but it is expected earthworks for the proposed
development will disturb more than 1000 tonnes and therefore this action criteria has been adopted.
Prepared for Cardno (Old) Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 6 of 37 Appendix 3 - Geotechnical Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 49.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.